[go: up one dir, main page]

IDEAS home Printed from https://ideas.repec.org/a/eee/ejores/v147y2003i1p62-71.html
   My bibliography  Save this article

A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes

Author

Listed:
  • Kiesmuller, G. P.
Abstract
No abstract is available for this item.

Suggested Citation

  • Kiesmuller, G. P., 2003. "A new approach for controlling a hybrid stochastic manufacturing/remanufacturing system with inventories and different leadtimes," European Journal of Operational Research, Elsevier, vol. 147(1), pages 62-71, May.
  • Handle: RePEc:eee:ejores:v:147:y:2003:i:1:p:62-71
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0377-2217(02)00351-X
    Download Restriction: Full text for ScienceDirect subscribers only
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Inderfurth, Karl & van der Laan, Erwin, 2001. "Leadtime effects and policy improvement for stochastic inventory control with remanufacturing," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 381-390, May.
    2. van der Laan, Erwin & Salomon, Marc, 1997. "Production planning and inventory control with remanufacturing and disposal," European Journal of Operational Research, Elsevier, vol. 102(2), pages 264-278, October.
    3. Teunter, Ruud H. & Vlachos, Dimitrios, 2002. "On the necessity of a disposal option for returned items that can be remanufactured," International Journal of Production Economics, Elsevier, vol. 75(3), pages 257-266, February.
    4. Vincent P. Simpson, 1978. "Optimum Solution Structure for a Repairable Inventory Problem," Operations Research, INFORMS, vol. 26(2), pages 270-281, April.
    5. van der Laan, Erwin & Salomon, Marc & Dekker, Rommert, 1999. "An investigation of lead-time effects in manufacturing/remanufacturing systems under simple PUSH and PULL control strategies," European Journal of Operational Research, Elsevier, vol. 115(1), pages 195-214, May.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Kilic, Onur A. & Tunc, Huseyin & Tarim, S. Armagan, 2018. "Heuristic policies for the stochastic economic lot sizing problem with remanufacturing under service level constraints," European Journal of Operational Research, Elsevier, vol. 267(3), pages 1102-1109.
    2. Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
    3. Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
    4. Corbacıoğlu, U. & van der Laan, E.A., 2005. "Setting the holding cost rates in a multi-product system with remanufacturing," ERIM Report Series Research in Management ERS-2005-072-LIS, Erasmus Research Institute of Management (ERIM), ERIM is the joint research institute of the Rotterdam School of Management, Erasmus University and the Erasmus School of Economics (ESE) at Erasmus University Rotterdam.
    5. Poles, Roberto, 2013. "System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies," International Journal of Production Economics, Elsevier, vol. 144(1), pages 189-199.
    6. Pellerin, Robert & Sadr, Javad & Gharbi, Ali & Malhamé, Roland, 2009. "A production rate control policy for stochastic repair and remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 121(1), pages 39-48, September.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Ahiska, S. Sebnem & King, Russell E., 2010. "Life cycle inventory policy characterizations for a single-product recoverable system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 51-61, March.
    2. Kim, Eungab & Saghafian, Soroush & Van Oyen, Mark P., 2013. "Joint control of production, remanufacturing, and disposal activities in a hybrid manufacturing–remanufacturing system," European Journal of Operational Research, Elsevier, vol. 231(2), pages 337-348.
    3. Nenes, George & Panagiotidou, Sofia & Dekker, Rommert, 2010. "Inventory control policies for inspection and remanufacturing of returns: A case study," International Journal of Production Economics, Elsevier, vol. 125(2), pages 300-312, June.
    4. Vercraene, Samuel & Gayon, Jean-Philippe & Flapper, Simme Douwe, 2014. "Coordination of manufacturing, remanufacturing and returns acceptance in hybrid manufacturing/remanufacturing systems," International Journal of Production Economics, Elsevier, vol. 148(C), pages 62-70.
    5. G P Kiesmüller & S Minner, 2003. "Simple expressions for finding recovery system inventory control parameter values," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 54(1), pages 83-88, January.
    6. Kiesmuller, G. P., 2003. "Optimal control of a one product recovery system with leadtimes," International Journal of Production Economics, Elsevier, vol. 81(1), pages 333-340, January.
    7. Dev, Navin K. & Shankar, Ravi & Choudhary, Alok, 2017. "Strategic design for inventory and production planning in closed-loop hybrid systems," International Journal of Production Economics, Elsevier, vol. 183(PB), pages 345-353.
    8. Z P Bayındır & N Erkip & R Güllü, 2005. "Assessing the benefits of remanufacturing option under one-way substitution," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 286-296, March.
    9. Poles, Roberto, 2013. "System Dynamics modelling of a production and inventory system for remanufacturing to evaluate system improvement strategies," International Journal of Production Economics, Elsevier, vol. 144(1), pages 189-199.
    10. Vercraene, Samuel & Gayon, Jean-Philippe, 2013. "Optimal control of a production-inventory system with productreturns," International Journal of Production Economics, Elsevier, vol. 142(2), pages 302-310.
    11. Jian Yang & Boaz Golany & Gang Yu, 2005. "A concave‐cost production planning problem with remanufacturing options," Naval Research Logistics (NRL), John Wiley & Sons, vol. 52(5), pages 443-458, August.
    12. Sebnem Ahiska, S. & King, Russell E., 2010. "Inventory optimization in a one product recoverable manufacturing system," International Journal of Production Economics, Elsevier, vol. 124(1), pages 11-19, March.
    13. Erwin van der Laan & Marc Salomon & Rommert Dekker & Luk Van Wassenhove, 1999. "Inventory Control in Hybrid Systems with Remanufacturing," Management Science, INFORMS, vol. 45(5), pages 733-747, May.
    14. Tang, Ou & Grubbstrom, Robert W., 2005. "Considering stochastic lead times in a manufacturing/remanufacturing system with deterministic demands and returns," International Journal of Production Economics, Elsevier, vol. 93(1), pages 285-300, January.
    15. Flapper, Simme Douwe & Gayon, Jean-Philippe & Lim, Lâm Laurent, 2014. "On the optimal control of manufacturing and remanufacturing activities with a single shared server," European Journal of Operational Research, Elsevier, vol. 234(1), pages 86-98.
    16. Nativi, Juan Jose & Lee, Seokcheon, 2012. "Impact of RFID information-sharing strategies on a decentralized supply chain with reverse logistics operations," International Journal of Production Economics, Elsevier, vol. 136(2), pages 366-377.
    17. Pinçe, Çerag & Gürler, Ülkü & Berk, Emre, 2008. "A continuous review replenishment-disposal policy for an inventory system with autonomous supply and fixed disposal costs," European Journal of Operational Research, Elsevier, vol. 190(2), pages 421-442, October.
    18. Bayindir, Z. Pelin & Erkip, Nesim & Gullu, Refik, 2003. "A model to evaluate inventory costs in a remanufacturing environment," International Journal of Production Economics, Elsevier, vol. 81(1), pages 597-607, January.
    19. Hosoda, Takamichi & Disney, Stephen M., 2018. "A unified theory of the dynamics of closed-loop supply chains," European Journal of Operational Research, Elsevier, vol. 269(1), pages 313-326.
    20. Mahadevan, B. & Pyke, David F. & Fleischmann, Moritz, 2003. "Periodic review, push inventory policies for remanufacturing," European Journal of Operational Research, Elsevier, vol. 151(3), pages 536-551, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:ejores:v:147:y:2003:i:1:p:62-71. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/eor .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.