[go: up one dir, main page]

IDEAS home Printed from https://ideas.repec.org/a/eee/proeco/v155y2014icp39-51.html
   My bibliography  Save this article

The lot sizing problem: A tertiary study

Author

Listed:
  • Glock, Christoph H.
  • Grosse, Eric H.
  • Ries, Jörg M.
Abstract
This paper provides a survey of literature reviews in the area of lot sizing. Its intention is to show which streams of research emerged from Harris' seminal lot size model, and which major achievements have been accomplished in the respective areas. We first develop the methodology of this review and then descriptively analyze the sample. Subsequently, a content-related classification scheme for lot sizing models is developed, and the reviews contained in our sample are discussed in light of this classification scheme. Our analysis shows that various extensions of Harris' lot size model were developed over the years, such as lot sizing models that include multi-stage inventory systems, incentives, or productivity issues. The aims of our tertiary study are the following: firstly, it helps primary researchers to position their own work in the literature, to reproduce the development of different types of lot sizing problems, and to find starting points if they intend to work in a new research direction. Secondly, the study identifies several topics that offer opportunities for future secondary research.

Suggested Citation

  • Glock, Christoph H. & Grosse, Eric H. & Ries, Jörg M., 2014. "The lot sizing problem: A tertiary study," International Journal of Production Economics, Elsevier, vol. 155(C), pages 39-51.
  • Handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:39-51
    DOI: 10.1016/j.ijpe.2013.12.009
    as

    Download full text from publisher

    File URL: http://www.sciencedirect.com/science/article/pii/S0925527313005689
    Download Restriction: Full text for ScienceDirect subscribers only

    File URL: https://libkey.io/10.1016/j.ijpe.2013.12.009?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bensmain, Yassir & Dahane, Mohammed & Bennekrouf, Mohammed & Sari, Zaki, 2019. "Preventive remanufacturing planning of production equipment under operational and imperfect maintenance constraints: A hybrid genetic algorithm based approach," Reliability Engineering and System Safety, Elsevier, vol. 185(C), pages 546-566.
    2. Prasert Aengchuan & Busaba Phruksaphanrat, 2018. "Comparison of fuzzy inference system (FIS), FIS with artificial neural networks (FIS + ANN) and FIS with adaptive neuro-fuzzy inference system (FIS + ANFIS) for inventory control," Journal of Intelligent Manufacturing, Springer, vol. 29(4), pages 905-923, April.
    3. Battini, Daria & Glock, Christoph H. & Grosse, Eric H. & Persona, Alessandro & Sgarbossa, Fabio, 2017. "Reprint of “Ergo-lot-sizing: An approach to integrate ergonomic and economic objectives in manual materials handling”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 32-42.
    4. Nima Kazemi & Salwa Hanim Abdul-Rashid & Ehsan Shekarian & Eleonora Bottani & Roberto Montanari, 2016. "A fuzzy lot-sizing problem with two-stage composite human learning," International Journal of Production Research, Taylor & Francis Journals, vol. 54(16), pages 5010-5025, August.
    5. Quetschlich, Mathias & Moetz, André & Otto, Boris, 2021. "Optimisation model for multi-item multi-echelon supply chains with nested multi-level products," European Journal of Operational Research, Elsevier, vol. 290(1), pages 144-158.
    6. Kim, Taebok & Glock, Christoph H., 2018. "Production planning for a two-stage production system with multiple parallel machines and variable production rates," International Journal of Production Economics, Elsevier, vol. 196(C), pages 284-292.
    7. Oliveira, Washington A. & Fiorotto, Diego J. & Song, Xiang & Jones, Dylan F., 2021. "An extended goal programming model for the multiobjective integrated lot-sizing and cutting stock problem," European Journal of Operational Research, Elsevier, vol. 295(3), pages 996-1007.
    8. Melega, Gislaine Mara & de Araujo, Silvio Alexandre & Jans, Raf, 2018. "Classification and literature review of integrated lot-sizing and cutting stock problems," European Journal of Operational Research, Elsevier, vol. 271(1), pages 1-19.
    9. S. Priyan & R. Uthayakumar, 2017. "Setup cost reduction EMQ inventory system with probabilistic defective and rework in multiple shipments management," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(2), pages 223-241, June.
    10. K. F. Mary Latha & M. Ganesh Kumar & R. Uthayakumar, 2021. "Two echelon economic lot sizing problems with geometric shipment policy backorder price discount and optimal investment to reduce ordering cost," OPSEARCH, Springer;Operational Research Society of India, vol. 58(4), pages 1133-1163, December.
    11. Glock, Christoph H. & Grosse, Eric H., 2021. "The impact of controllable production rates on the performance of inventory systems: A systematic review of the literature," European Journal of Operational Research, Elsevier, vol. 288(3), pages 703-720.
    12. Glock, Christoph H. & Grosse, Eric H. & Ries, Jörg M., 2017. "Reprint of “Decision support models for supplier development: Systematic literature review and research agenda”," International Journal of Production Economics, Elsevier, vol. 194(C), pages 246-260.
    13. Davide Castellano & Christoph H. Glock, 2021. "The average-cost formulation of lot sizing models and inventory carrying charges: a technical note," Operations Management Research, Springer, vol. 14(1), pages 194-201, June.
    14. Hovelaque, Vincent & Bironneau, Laurent, 2015. "The carbon-constrained EOQ model with carbon emission dependent demand," International Journal of Production Economics, Elsevier, vol. 164(C), pages 285-291.
    15. Jafari, L. & Makis, V., 2015. "Joint optimal lot sizing and preventive maintenance policy for a production facility subject to condition monitoring," International Journal of Production Economics, Elsevier, vol. 169(C), pages 156-168.
    16. Avelina Alejo-Reyes & Erik Cuevas & Alma Rodríguez & Abraham Mendoza & Elias Olivares-Benitez, 2020. "An Improved Grey Wolf Optimizer for a Supplier Selection and Order Quantity Allocation Problem," Mathematics, MDPI, vol. 8(9), pages 1-24, August.
    17. Flavio Molina & Reinaldo Morabito & Silvio Alexandre de Araujo, 2016. "MIP models for production lot sizing problems with distribution costs and cargo arrangement," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 67(11), pages 1395-1407, November.
    18. Lucio Enrico Zavanella & Beatrice Marchi & Simone Zanoni & Ivan Ferretti, 2019. "Energy considerations for the economic production quantity and the joint economic lot sizing," Journal of Business Economics, Springer, vol. 89(7), pages 845-865, September.
    19. Sahling, Florian & Hahn, Gerd J., 2019. "Dynamic lot sizing in biopharmaceutical manufacturing," International Journal of Production Economics, Elsevier, vol. 207(C), pages 96-106.
    20. Mac Cawley, Alejandro & Maturana, Sergio & Pascual, Rodrigo & Tortorella, Guilherme Luz, 2022. "Scheduling wine bottling operations with multiple lines and sequence-dependent set-up times: Robust formulation and a decomposition solution approach," European Journal of Operational Research, Elsevier, vol. 303(2), pages 819-839.
    21. Menezes, Mozart B.C. & Jalali, Hamed & Lamas, Alejandro, 2021. "One too many: Product proliferation and the financial performance in manufacturing," International Journal of Production Economics, Elsevier, vol. 242(C).

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:39-51. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.