Retailer’s economic order quantity when the supplier offers conditionally permissible delay in payments link to order quantity
Author
Suggested Citation
DOI: 10.1016/j.ijpe.2013.05.032
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Jinn-Tsair Teng & Kuo-Ren Lou, 2012. "Seller’s optimal credit period and replenishment time in a supply chain with up-stream and down-stream trade credits," Journal of Global Optimization, Springer, vol. 53(3), pages 417-430, July.
- Liao, Jui-Jung, 2008. "An EOQ model with noninstantaneous receipt and exponentially deteriorating items under two-level trade credit," International Journal of Production Economics, Elsevier, vol. 113(2), pages 852-861, June.
- Chun-Tao Chang & Jinn-Tsair Teng & Suresh Kumar Goyal, 2008. "Inventory Lot-Size Models Under Trade Credits: A Review," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 25(01), pages 89-112.
- Teng, Jinn-Tsair, 2009. "A simple method to compute economic order quantities," European Journal of Operational Research, Elsevier, vol. 198(1), pages 351-353, October.
- Kun-Jen Chung, 2012. "On the validity of the arithmetic–geometric mean method to locate the optimal solution in a supply chain system," International Journal of Systems Science, Taylor & Francis Journals, vol. 43(8), pages 1454-1463.
- Teng, Jinn-Tsair & Krommyda, Iris-Pandora & Skouri, Konstantina & Lou, Kuo-Ren, 2011. "A comprehensive extension of optimal ordering policy for stock-dependent demand under progressive payment scheme," European Journal of Operational Research, Elsevier, vol. 215(1), pages 97-104, November.
- Chang, Chun-Tao & Teng, Jinn-Tsair & Chern, Maw-Sheng, 2010. "Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits," International Journal of Production Economics, Elsevier, vol. 127(1), pages 197-202, September.
- Goyal, Suresh Kumar & Teng, Jinn-Tsair & Chang, Chun-Tao, 2007. "Optimal ordering policies when the supplier provides a progressive interest scheme," European Journal of Operational Research, Elsevier, vol. 179(2), pages 404-413, June.
- Teng, Jinn-Tsair, 2009. "Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers," International Journal of Production Economics, Elsevier, vol. 119(2), pages 415-423, June.
- Soni, Hardik & Shah, Nita H., 2008. "Optimal ordering policy for stock-dependent demand under progressive payment scheme," European Journal of Operational Research, Elsevier, vol. 184(1), pages 91-100, January.
- J-T Teng, 2002. "On the economic order quantity under conditions of permissible delay in payments," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 53(8), pages 915-918, August.
- Huang, Yung-Fu, 2007. "Economic order quantity under conditionally permissible delay in payments," European Journal of Operational Research, Elsevier, vol. 176(2), pages 911-924, January.
- J-T Teng & S K Goyal, 2007. "Optimal ordering policies for a retailer in a supply chain with up-stream and down-stream trade credits," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 58(9), pages 1252-1255, September.
- Huang, Yung-Fu & Hsu, Kuang-Hua, 2008. "An EOQ model under retailer partial trade credit policy in supply chain," International Journal of Production Economics, Elsevier, vol. 112(2), pages 655-664, April.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Chern, Maw-Sheng & Pan, Qinhua & Teng, Jinn-Tsair & Chan, Ya-Lan & Chen, Sheng-Chih, 2013. "Stackelberg solution in a vendor–buyer supply chain model with permissible delay in payments," International Journal of Production Economics, Elsevier, vol. 144(1), pages 397-404.
- A. Thangam, 2017. "Retailer’s optimal replenishment policy in a two-echelon supply chain under two-part delay in payments and disruption in delivery," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 8(1), pages 26-46, January.
- Teng, Jinn-Tsair & Lou, Kuo-Ren & Wang, Lu, 2014. "Optimal trade credit and lot size policies in economic production quantity models with learning curve production costs," International Journal of Production Economics, Elsevier, vol. 155(C), pages 318-323.
- Seifert, Daniel & Seifert, Ralf W. & Protopappa-Sieke, Margarita, 2013. "A review of trade credit literature: Opportunities for research in operations," European Journal of Operational Research, Elsevier, vol. 231(2), pages 245-256.
- Chung, Kun-Jen & Eduardo Cárdenas-Barrón, Leopoldo & Ting, Pin-Shou, 2014. "An inventory model with non-instantaneous receipt and exponentially deteriorating items for an integrated three layer supply chain system under two levels of trade credit," International Journal of Production Economics, Elsevier, vol. 155(C), pages 310-317.
- Wang, Wan-Chih & Teng, Jinn-Tsair & Lou, Kuo-Ren, 2014. "Seller’s optimal credit period and cycle time in a supply chain for deteriorating items with maximum lifetime," European Journal of Operational Research, Elsevier, vol. 232(2), pages 315-321.
- Wu, Jiang & Ouyang, Liang-Yuh & Cárdenas-Barrón, Leopoldo Eduardo & Goyal, Suresh Kumar, 2014. "Optimal credit period and lot size for deteriorating items with expiration dates under two-level trade credit financing," European Journal of Operational Research, Elsevier, vol. 237(3), pages 898-908.
- Xu, Xinhan & Chen, Xiangfeng & Jia, Fu & Brown, Steve & Gong, Yu & Xu, Yifan, 2018. "Supply chain finance: A systematic literature review and bibliometric analysis," International Journal of Production Economics, Elsevier, vol. 204(C), pages 160-173.
- Chen, Sheng-Chih & Teng, Jinn-Tsair, 2015. "Inventory and credit decisions for time-varying deteriorating items with up-stream and down-stream trade credit financing by discounted cash flow analysis," European Journal of Operational Research, Elsevier, vol. 243(2), pages 566-575.
- Li, Ruihai & Skouri, Konstantina & Teng, Jinn-Tsair & Yang, Wen-Goang, 2018. "Seller's optimal replenishment policy and payment term among advance, cash, and credit payments," International Journal of Production Economics, Elsevier, vol. 197(C), pages 35-42.
- Chang, Chun-Tao & Teng, Jinn-Tsair & Chern, Maw-Sheng, 2010. "Optimal manufacturer's replenishment policies for deteriorating items in a supply chain with up-stream and down-stream trade credits," International Journal of Production Economics, Elsevier, vol. 127(1), pages 197-202, September.
- Teng, Jinn-Tsair & Min, Jie & Pan, Qinhua, 2012. "Economic order quantity model with trade credit financing for non-decreasing demand," Omega, Elsevier, vol. 40(3), pages 328-335.
- Johari, Maryam & Hosseini-Motlagh, Seyyed-Mahdi & Nematollahi, Mohammadreza & Goh, Mark & Ignatius, Joshua, 2018. "Bi-level credit period coordination for periodic review inventory system with price-credit dependent demand under time value of money," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 114(C), pages 270-291.
- Ali Akbar Shaikh & Leopoldo Eduardo Cárdenas-Barrón & Amalesh Kumar Manna & Armando Céspedes-Mota & Gerardo Treviño-Garza, 2021. "Two Level Trade Credit Policy Approach in Inventory Model with Expiration Rate and Stock Dependent Demand under Nonzero Inventory and Partial Backlogged Shortages," Sustainability, MDPI, vol. 13(23), pages 1-19, December.
- Teng, Jinn-Tsair, 2009. "Optimal ordering policies for a retailer who offers distinct trade credits to its good and bad credit customers," International Journal of Production Economics, Elsevier, vol. 119(2), pages 415-423, June.
- Gour Chandra Mahata & Sujit Kumar De, 2016. "An EOQ inventory system of ameliorating items for price dependent demand rate under retailer partial trade credit policy," OPSEARCH, Springer;Operational Research Society of India, vol. 53(4), pages 889-916, December.
- B. C. Giri & S. Sharma, 2016. "Optimal ordering policy for an inventory system with linearly increasing demand and allowable shortages under two levels trade credit financing," Operational Research, Springer, vol. 16(1), pages 25-50, April.
- Liang-Yuh Ouyang & Cheng-Ju Chuang & Chia-Huei Ho & Chien-Wei Wu, 2014. "An integrated inventory model with quality improvement and two-part credit policy," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 22(3), pages 1042-1061, October.
- Zhou, Yong-Wu & Zhong, Yuanguang & Li, Jicai, 2012. "An uncooperative order model for items with trade credit, inventory-dependent demand and limited displayed-shelf space," European Journal of Operational Research, Elsevier, vol. 223(1), pages 76-85.
- Pourmohammad Zia, Nadia & Taleizadeh, Ata Allah, 2015. "A lot-sizing model with backordering under hybrid linked-to-order multiple advance payments and delayed payment," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 82(C), pages 19-37.
More about this item
Keywords
EOQ; Inventory; Finance; Conditionally permissible delay; Arithmetic–geometric mean inequality;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:155:y:2014:i:c:p:284-291. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.