Properties of lot-sizing rules under lumpy demand
Author
Suggested Citation
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Yilmaz, Cengiz, 1992. "Incremental order quantity for the case of very lumpy demand," International Journal of Production Economics, Elsevier, vol. 26(1-3), pages 367-371, February.
- Bartezzaghi, Emilio & Verganti, Roberto & Zotteri, Giulio, 1999. "A simulation framework for forecasting uncertain lumpy demand," International Journal of Production Economics, Elsevier, vol. 59(1-3), pages 499-510, March.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Yan, Xi Steven & Robb, David J. & Silver, Edward A., 2009. "Inventory performance under pack size constraints and spatially-correlated demand," International Journal of Production Economics, Elsevier, vol. 117(2), pages 330-337, February.
- Demirel, Edil & Özelkan, Ertunga C. & Lim, Churlzu, 2018. "Aggregate planning with Flexibility Requirements Profile," International Journal of Production Economics, Elsevier, vol. 202(C), pages 45-58.
- Tiacci, Lorenzo & Saetta, Stefano, 2009. "An approach to evaluate the impact of interaction between demand forecasting method and stock control policy on the inventory system performances," International Journal of Production Economics, Elsevier, vol. 118(1), pages 63-71, March.
- Sahling, Florian & Hahn, Gerd J., 2019. "Dynamic lot sizing in biopharmaceutical manufacturing," International Journal of Production Economics, Elsevier, vol. 207(C), pages 96-106.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Wang, Shengjie & Kang, Yanfei & Petropoulos, Fotios, 2024. "Combining probabilistic forecasts of intermittent demand," European Journal of Operational Research, Elsevier, vol. 315(3), pages 1038-1048.
- Corey Ducharme & Bruno Agard & Martin Trépanier, 2024. "Improving demand forecasting for customers with missing downstream data in intermittent demand supply chains with supervised multivariate clustering," Journal of Forecasting, John Wiley & Sons, Ltd., vol. 43(5), pages 1661-1681, August.
- Bartezzaghi, Emilio & Verganti, Roberto & Zotteri, Giulio, 1999. "Measuring the impact of asymmetric demand distributions on inventories," International Journal of Production Economics, Elsevier, vol. 60(1), pages 395-404, April.
- Zotteri, Giulio & Verganti, Roberto, 2001. "Multi-level approaches to demand management in complex environments: an analytical model," International Journal of Production Economics, Elsevier, vol. 71(1-3), pages 221-233, May.
- Danese, Pamela & Kalchschmidt, Matteo, 2011. "The impact of forecasting on companies' performance: Analysis in a multivariate setting," International Journal of Production Economics, Elsevier, vol. 133(1), pages 458-469, September.
- Murphy Choy & Michelle L. F. Cheong, 2011. "Identification of Demand through Statistical Distribution Modeling for Improved Demand Forecasting," Papers 1110.0062, arXiv.org.
- Jože Martin Rožanec & Blaž Fortuna & Dunja Mladenić, 2022. "Reframing Demand Forecasting: A Two-Fold Approach for Lumpy and Intermittent Demand," Sustainability, MDPI, vol. 14(15), pages 1-21, July.
- Bacchetti, Andrea & Saccani, Nicola, 2012. "Spare parts classification and demand forecasting for stock control: Investigating the gap between research and practice," Omega, Elsevier, vol. 40(6), pages 722-737.
- Erick Sager & Olga A. Timoshenko, 2021. "Demand Uncertainty, Selection, and Trade," DETU Working Papers 2104, Department of Economics, Temple University.
- Petropoulos, Fotios & Apiletti, Daniele & Assimakopoulos, Vassilios & Babai, Mohamed Zied & Barrow, Devon K. & Ben Taieb, Souhaib & Bergmeir, Christoph & Bessa, Ricardo J. & Bijak, Jakub & Boylan, Joh, 2022.
"Forecasting: theory and practice,"
International Journal of Forecasting, Elsevier, vol. 38(3), pages 705-871.
- Fotios Petropoulos & Daniele Apiletti & Vassilios Assimakopoulos & Mohamed Zied Babai & Devon K. Barrow & Souhaib Ben Taieb & Christoph Bergmeir & Ricardo J. Bessa & Jakub Bijak & John E. Boylan & Jet, 2020. "Forecasting: theory and practice," Papers 2012.03854, arXiv.org, revised Jan 2022.
- Muñoz Negrón, David F. & Muñoz Medina, Diego F., 2009. "Bayesian Forecastings For Automobile Parts Using Stochastic Simulation," Journal of Economics, Finance and Administrative Science, Universidad ESAN, vol. 14(27), pages 7-20.
- Ghobbar, A.A & Friend, C.H, 2002. "Sources of intermittent demand for aircraft spare parts within airline operations," Journal of Air Transport Management, Elsevier, vol. 8(4), pages 221-231.
- Nenes, George & Panagiotidou, Sofia & Tagaras, George, 2010. "Inventory management of multiple items with irregular demand: A case study," European Journal of Operational Research, Elsevier, vol. 205(2), pages 313-324, September.
- Sarker, Bhaba R. & Balan, Chidambaram V., 1999. "Operations planning for a multi-stage kanban system," European Journal of Operational Research, Elsevier, vol. 112(2), pages 284-303, January.
- Gutierrez, Rafael S. & Solis, Adriano O. & Mukhopadhyay, Somnath, 2008. "Lumpy demand forecasting using neural networks," International Journal of Production Economics, Elsevier, vol. 111(2), pages 409-420, February.
- Syntetos, A.A. & Teunter, R.H. & Babai, M.Z. & Transchel, S., 2016. "On the benefits of delayed ordering," European Journal of Operational Research, Elsevier, vol. 248(3), pages 963-970.
- Sarker, Bhaba R. & Parija, Gyana R., 1996. "Optimal batch size and raw material ordering policy for a production system with a fixed-interval, lumpy demand delivery system," European Journal of Operational Research, Elsevier, vol. 89(3), pages 593-608, March.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:eee:proeco:v:81-82:y:2003:i:1:p:295-307. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Catherine Liu (email available below). General contact details of provider: http://www.elsevier.com/locate/ijpe .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.