Milford station is a commuter rail station on the Northeast Corridor in Milford, Connecticut. It is served by the Metro-North Railroad New Haven Line plus limited CT Rail Shore Line East service.
Milford | |||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | |||||||||||||||||||||
Location | 1 Railroad Avenue Milford, Connecticut | ||||||||||||||||||||
Coordinates | 41°13′20″N 73°03′35″W / 41.222350°N 73.059619°W | ||||||||||||||||||||
Owned by | ConnDOT | ||||||||||||||||||||
Line(s) | ConnDOT New Haven Line (Northeast Corridor) | ||||||||||||||||||||
Platforms | 2 side platforms | ||||||||||||||||||||
Tracks | 3 | ||||||||||||||||||||
Connections | CTTransit New Haven: 271M Milford Transit: 2, 3, 4, Coastal Link, Milford Commuter Connection - Orange-Milford | ||||||||||||||||||||
Construction | |||||||||||||||||||||
Parking | 676 spaces | ||||||||||||||||||||
Other information | |||||||||||||||||||||
Fare zone | 20 (Metro-North) | ||||||||||||||||||||
History | |||||||||||||||||||||
Opened | December 25, 1848 | ||||||||||||||||||||
Passengers | |||||||||||||||||||||
2018 | 1,508 daily boardings[1] (Metro-North) | ||||||||||||||||||||
Services | |||||||||||||||||||||
| |||||||||||||||||||||
| |||||||||||||||||||||
|
Station layout
editThe station has two high-level side platforms. The northern platform, adjacent to Track 1, is four cars long and generally used by westbound trains. The southern platform, adjacent to Track 4, is 10 cars long and generally used by eastbound trains. The New Haven Line has three tracks at this location. The inner track, not adjacent to either platform, is used only by express trains. Milford is the only station on the New Haven Line with only three tracks.[2][3]: 23 The Northeast Corridor Commission identified restoring the fourth track in Milford as a priority in a 2021 report.[4]
The station has 676 parking spaces, 444 of which are owned by the state.[5]
History
editThe station opened on December 25, 1848.[6][7] The brick south (eastbound) station building was constructed around 1881. It is similar to other stations constructed by the New York, New Haven and Hartford Railroad at Fairfield and Southport. The wooden westbound (north) building was constructed in 1896 when the line was quadruple-tracked.[8] The station agent was eliminated by Penn Central on January 15, 1972.[9]
Shore Line East service at the station was suspended indefinitely on March 16, 2020, due to the coronavirus pandemic.[10][11] Service resumed on October 7, 2024.[12]
References
edit- ^ Metro-North 2018 Weekday Station Boardings. Metro-North Railroad Market Analysis/Fare Policy Group. April 2019. p. 6.
- ^ "Metro-North Railroad EMPLOYEE TIMETABLE No. 4" (PDF). Metro-North Railroad. February 5, 2006. Archived from the original (PDF) on October 19, 2012. Retrieved November 8, 2015.
- ^ "Metro-North Railroad Track & Structures Department Track Charts Maintenance Program Interlocking Diagrams & Yard Diagrams 2015" (PDF). Metro-North Railroad. 2015. Retrieved January 28, 2019.
- ^ "CHAPTER 5: Connecticut-Westchester" (PDF). CONNECT NEC 2035.
- ^ Urbitran Associates Inc. (July 2003). "Task 2: Technical Memorandum parking Inventory and Utilization: Final Report" (PDF). Connecticut Department of Transportation. Table 1: New Haven Line Parking Capacity and Utilization, Page 6. Archived from the original (PDF) on July 12, 2007."
- ^ Jenkins, Stephen (1912). The Story of the Bronx from the Purchase Made by the Dutch from the Indians in 1639 to the Present Day. New York, New York: G.P. Putnam's Sons. p. 235.
- ^ "Special Express Notice". The Evening Post. New York, New York. February 12, 1849. p. 3. Retrieved December 9, 2019 – via Newspapers.com.
- ^ Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. pp. 64–65. ISBN 9780942147087.
- ^ "7 County R.R. Stations to Quit Selling Tickets". The Bridgeport Post. January 6, 1972. pp. 1, 16. Retrieved March 28, 2020 – via Newspapers.com.
- ^ @SLEalerts (March 13, 2020). "Effective 3/16/20, ALL weekday (Monday - Friday) CTrail Shore Line East trains will operate on an enhanced weekend schedule until further notice" (Tweet) – via Twitter.
- ^ "Shore Line East Service Information" (PDF). April 20, 2020. Archived from the original (PDF) on September 20, 2020. Retrieved April 29, 2020.
- ^ "Stamford Through Service Returns to the Schedule" (Press release). Connecticut Department of Transportation. September 30, 2024.
External links
editMedia related to Milford station (Connecticut) at Wikimedia Commons