[go: up one dir, main page]

Jump to content

User:Cygnusloop99~enwiki

From Wikipedia, the free encyclopedia

Hi. Im new in case you couldn't tell. Lets see what useless info I can add.

To Do List

[edit]

Photos needed

[edit]

Photos taken by me

Photo of the house from Summit Avenue.
Photo from the upper level of the North end zone during construction in April 2005
Buildings of CityCenter as viewed from the Aria. From left to right The Harmon, Crystals, Veer Towers and the Mandarin Oriental.


Testing

[edit]

Cooridnate test
Folkestone: 51°5′49.5″N 1°9′21″E / 51.097083°N 1.15583°E / 51.097083; 1.15583 (Folkestone Portal)
Coquelles: 50°55′22″N 1°46′50.16″E / 50.92278°N 1.7806000°E / 50.92278; 1.7806000 (Coquelles Portal)


33°26'52.50"N 112° 4'23.00"W Office 33°26'50.50"N 112° 4'23.00"W Hotel 33°26'52.00"N 112° 4'28.00"W Retail 33°26'51.50"N 112° 4'25.75"W Overall Grand opening Nov 4, 2010 1.8 million sf total $900 million const 2007-2010 Kimpton Hotels & Restaurant Group tower topped out July 16 2009 hotel ref[1] const begins ref[2] grand opening ref[3]

CityScape Office Tower - Phase Ia
The office tower at Cityscape in Downtown Phoenix
General information
TypeOffice Building
Address1 East Washington Street
Phoenix, Arizona 85004
Construction startedOctober 2008
CompletedApril 2010
OwnerRed Development
Technical details
Structural systemReinforced cast-in-place concrete columns and floor with a glass facade
Floor count27
Floor area620,000
Lifts/elevators16
Design and construction
Architecture firmCallison
Main contractorHunt Construction
CityScape Retail Shops - Phase Ib
General information
TypeRetail Shopping Center
Address50 West Jefferson Street
and
11 West Washington Street
Phoenix, Arizona 85004
OwnerRed Development
Technical details
Structural systemSteel
Floor count2
Floor area200,000
Design and construction
Main contractorHunt Construction
Hotel Palomar - Phase II
General information
TypeBoutique Hotel
Address2 East Jefferson Street
Phoenix, Arizona 85004
Cost$34.3 million
OwnerRed Development
Technical details
Structural systemReinforced cast-in-place concrete columns and floor with a glass facade
Floor count34
Design and construction
Main contractorHunt Construction

Temp References

[edit]