[go: up one dir, main page]

Jump to content

USS Remora

From Wikipedia, the free encyclopedia
(Redirected from USS Remora (SS-487))
USS Remora after Greater Underwater Propulsive Power Program (GUPPY-II) conversion.
History
United States
NameRemora
NamesakeRemora
BuilderPortsmouth Naval Shipyard, KitteryMaine[1]
Laid down5 March 1945[1]
Launched12 July 1945[1]
Sponsored byMrs. T. W. Samuels III
Commissioned3 January 1946[1]
Decommissioned29 October 1973[1]
Stricken29 October 1973[2]
IdentificationSS-487
FateTransferred to Greece, 29 October 1973
Greece
NameKatsonis
Acquired29 October 1973
Decommissioned31 March 1993
IdentificationS-115
General characteristics (As completed)
Class and typeTench-class diesel-electric submarine[2]
Displacement
  • 1,570 tons (1,595 t) surfaced [2]
  • 2,414 tons (2,453 t) submerged [2]
Length311 ft 8 in (95.00 m) [2]
Beam27 ft 4 in (8.33 m) [2]
Draft17 ft (5.2 m) maximum [2]
Propulsion
Speed
  • 20.25 knots (38 km/h) surfaced [6]
  • 8.75 knots (16 km/h) submerged [6]
Range11,000 nautical miles (20,000 km) surfaced at 10 knots (19 km/h) [6]
Endurance
  • 48 hours at 2 knots (3.7 km/h) submerged [6]
  • 75 days on patrol
Test depth400 ft (120 m) [6]
Complement10 officers, 71 enlisted [6]
Armament
General characteristics (Guppy II)
Displacement
  • 1,870 tons (1,900 t) surfaced [7]
  • 2,440 tons (2,480 t) submerged [7]
Length307 ft (93.6 m) [8]
Beam27 ft 4 in (7.4 m) [8]
Draft17 ft (5.2 m) [8]
Propulsion
  • Snorkel added[7]
  • Batteries upgraded to GUPPY type, capacity expanded to 504 cells (1 × 184 cell, 1 × 68 cell, and 2 × 126 cell batteries) [7]
Speed
  • Surfaced:
  • 18.0 knots (33.3 km/h) maximum
  • 13.5 knots (25.0 km/h) cruising
  • Submerged:
  • 16.0 knots (29.6 km/h) for ½ hour
  • 9.0 knots (16.7 km/h) snorkeling
  • 3.5 knots (6.5 km/h) cruising [7]
Range15,000 nm (28,000 km) surfaced at 11 knots (20 km/h) [8]
Endurance48 hours at 4 knots (7 km/h) submerged [8]
Complement
  • 9–10 officers
  • 5 petty officers
  • 70 enlisted men [8]
Sensors and
processing systems
  • WFA active sonar
  • JT passive sonar
  • Mk 106 torpedo fire control system [8]
Armament
General characteristics (Guppy III)
Displacement
  • 1,975 tons (2,007 t) surfaced [7]
  • 2,450 tons (2,489 t) submerged [7]
Length321 ft (97.8 m) [8]
Beam27 ft 4 in (7.4 m) [8]
Draft17 ft (5.2 m) [8]
Speed
  • Surfaced:
  • 17.2 knots (31.9 km/h) maximum
  • 12.2 knots (22.6 km/h) cruising
  • Submerged:
  • 14.5 knots (26.9 km/h) for ½ hour
  • 6.2 knots (11.5 km/h) snorkeling
  • 3.7 knots (6.9 km/h) cruising [7]
Range15,900 nm (29,400 km) surfaced at 8.5 knots (16 km/h) [8]
Endurance36 hours at 3 knots (6 km/h) submerged [8]
Complement
  • 8–10 officers
  • 5 petty officers
  • 70-80 enlisted men [8]
Sensors and
processing systems
  • BQS-4 active search sonar
  • BQR-2B passive search sonar
  • BQG-4 passive attack sonar [8]

USS Remora (SS-487), a Tench-class submarine, was the only ship of the United States Navy to be named for the remora, a fish with a suctorial disk on its head enabling it to cling to other fish and to ships.

Construction and commissioning

[edit]

Remora′s keel was laid down on 5 March 1945 by the Portsmouth Navy Yard in Kittery, Maine. She was launched on 12 July 1945, sponsored by Mrs. T. W. Samuels III, and commissioned on 3 January 1946 with Commander Robert Sellars in command.

Service history

[edit]

Training submarine

[edit]

Completing her Caribbean Sea shakedown in April 1946, Remora operated out of New London, Connecticut, as a training submarine until January 1947. Then transferred to the Pacific, she transited the Panama Canal at mid-month and arrived at Mare Island, Vallejo, California, on 14 February to begin a Greater Underwater Propulsive Power Program (GUPPY-II) conversion. Early in November, she completed trials and on 22 February arrived at San Diego, California, her new homeport.

Eastern Pacific

[edit]

For the next two years, she remained in the eastern Pacific operating primarily off California, but during the summer and early fall of 1948, ranged as far north as the Aleutian Islands. On 1 May 1950 she headed west for her first deployment in the Far East. On 8 June she arrived at Sasebo, and on 11 June she shifted to Yokosuka, from which base she conducted anti-submarine warfare (ASW) training exercises with units of Naval Forces Far East. Two weeks later the Korean War began.

A unit of TF 96, Naval Forces Japan Remora patrolled Soya Strait, between Hokkaidō and Sakhalin in late July and early August. Later in the month, she headed back to San Diego. During the next two years she underwent overhaul, provided services for the Line School at Monterey, California, and conducted local training exercises. She returned to the western Pacific in early 1953. Arriving at Buckner Bay on 15 March, she continued on to Japan in April and at mid-month rejoined TF 96. In June she was back in Okinawan waters for patrols and exercises, after which she returned to Yokosuka. On 2 July she headed east, reaching San Diego on 3 August.

After the fighting in Korea ended, Remora remained based at San Diego and through the decade continued to alternate training exercises and patrols in the western Pacific with similar First Fleet operations off the United States West Coast and in Hawaiian waters. She remained in the eastern Pacific during 1956 and 1958, but, during the spring of the latter year, was engaged in extended exercises off Alaska.


Pearl Harbor

[edit]

In November 1961, Remora was transferred from San Diego to Pearl Harbor. The following year she underwent a seven-month Greater Underwater Propulsive Power Program (GUPPY-III) conversion which lengthened her hull by 15 feet (5 m) and her conning tower by five feet. Then, in 1963, she was employed to evaluate antisubmarine sonar in Hawaiian waters. In May 1964, she resumed a schedule of annual six-month WestPac deployments which she continued into 1969. Remora was one of the last diesel boats to receive the Navy Unit Commendation for "Meritorious Service for operations during the Summer and Fall of 1967." During a shipyard overhaul in late 1967 early 1968, Engine #1 was removed and replaced with a "Prairie Masker" system designed to mask her engines during snorkeling.

In July 1969, Remora shifted home ports, from Pearl Harbor to Charleston, South Carolina. With the exception of one Mediterranean Sea cruise, from 16 February to 26 June 1970, she continued to operate out of Charleston, along the Atlantic seaboard, in the Caribbean Sea, and in the Gulf of Mexico, until decommissioned 29 October 1973 at Charleston.

Greek service

[edit]

After decommissioning from US Navy in 1973, she was transferred to the Hellenic Navy as a sale, and recommissioned Katsonis (S-115). She served until 31 March 1993, when she was decommissioned.

References

[edit]
  1. ^ a b c d e Friedman, Norman (1995). U.S. Submarines Through 1945: An Illustrated Design History. Annapolis, Maryland: United States Naval Institute. pp. 285–304. ISBN 1-55750-263-3.
  2. ^ a b c d e f g Bauer, K. Jack; Roberts, Stephen S. (1991). Register of Ships of the U.S. Navy, 1775-1990: Major Combatants. Westport, Connecticut: Greenwood Press. pp. 280–282. ISBN 0-313-26202-0.
  3. ^ a b c d e Bauer, K. Jack; Roberts, Stephen S. (1991). Register of Ships of the U.S. Navy, 1775–1990: Major Combatants. Westport, Connecticut: Greenwood Press. pp. 275–282. ISBN 978-0-313-26202-9.
  4. ^ U.S. Submarines Through 1945 pp. 261–263
  5. ^ a b c U.S. Submarines Through 1945 pp. 305–311
  6. ^ a b c d e f U.S. Submarines Through 1945 pp. 305-311
  7. ^ a b c d e f g h i Friedman, Norman (1994). U.S. Submarines Since 1945: An Illustrated Design History. Annapolis, Maryland: United States Naval Institute. pp. 11–43. ISBN 1-55750-260-9.
  8. ^ a b c d e f g h i j k l m n o U.S. Submarines Since 1945 pp. 242

Public Domain This article incorporates text from the public domain Dictionary of American Naval Fighting Ships. The entry can be found here.

[edit]