[go: up one dir, main page]

Jump to content

Tao Poon MRT station

Coordinates: 13°48′22″N 100°31′51″E / 13.8062°N 100.5308°E / 13.8062; 100.5308
From Wikipedia, the free encyclopedia
เตาปูน BL10 
Tao Poon PP16 
|  MRT   MRT 
Tao Poon station
General information
LocationBang Sue, Bangkok, Thailand
Coordinates13°48′22.4″N 100°31′51.2″E / 13.806222°N 100.530889°E / 13.806222; 100.530889
Owned byMass Rapid Transit Authority of Thailand
Operated byBangkok Expressway and Metro Public Company Limited
Line(s)
Platforms4 (2 side platforms, 1 island platform)
Tracks4
ConnectionsBus, Taxi
Construction
Structure typeElevated
ParkingNot available
Bicycle facilitiesYes
AccessibleYes
Other information
Station code BL10   PP16 
History
Opened6 August 2016; 8 years ago (2016-08-06)
(Purple Line)[1]
11 August 2017; 7 years ago (2017-08-11)
(Blue Line)[2]
Passengers
20212,200,468
Services
Preceding station Metropolitan Rapid Transit Following station
Bang Sue
towards Lak Song
Blue Line Bang Pho
towards Tha Phra
Bang Son Purple Line Terminus
Under construction
Terminus Purple Line
Southern Extension
Parliament House
towards Khru Nai

Tao Poon station (Thai: สถานีเตาปูน, RTGSSathani Tao Pun, pronounced [sā.tʰǎː.nīː tāw pūːn]) is a MRT station in Bangkok, located on Tao Pun Junction, Bang Sue District, Bangkok. It is an interchange station of the Blue Line and Purple Line. It is also currently a terminal station for Purple line.

History

[edit]

The station was opened on 6 August 2016,[3] initially with only Purple line service and were not connected to the rest of Bangkok's rapid transit system due to construction delays and a contract dispute.[4] This resulted in Prime Minister Prayut Chan-o-cha invoking the section 44 of the 2014 interim constitution of Thailand on 27 December 2016 to allow construction to proceed, and allowing BEM to operate Blue line service on this station.[5][4] During that time, free shuttle bus service was provided, connecting Tao Poon station to a nearby Bang Sue MRT station.

The one-station Blue Line extension from Bang Sue to Tao Poon was opened on 11 August 2017, adding Blue Line service to the station and enabling direct transfers between the two lines.[6] The station served as the terminal station of Blue line until 4 December 2019, when the Blue line service was extended from Tao Poon to Sirindhorn station.[7]

Future

[edit]

The purple line was planned to be extended southward, from Tao Poon to Rat Burana.[8][9] The extension has been approved by the cabinet in 2017,[10] but bidding did not began until November 2021, which is set to be completed by March 2022.[11] Construction is set to begin in third quarter of 2022 and expected to be complete by the end of 2027.[12]

[edit]

References

[edit]
  1. ^ "ข่าวรอบวัน".
  2. ^ "เปิดแน่ 11 ส.ค. จุดเชื่อมรถไฟฟ้าสีม่วง-สีน้ำเงิน - VoiceTV". Archived from the original on 2017-08-13. Retrieved 2017-07-25.
  3. ^ "หายไปไหน 1 สถานี? เจาะปมพิลึกสร้างรถไฟฟ้าไม่เชื่อม วุ่นแน่ ส.ค.นี้!".
  4. ^ a b "'บิ๊กตู่'ใช้ ม.44 ไฟเขียวจ้างเดินรถขาดช่วงเตาปูน-บางซื่อ ได้ทันที". ข่าวสด (in Thai). 2016-12-27. Retrieved 2021-12-27.
  5. ^ "คำสั่งหัวหน้าคณะรักษาความสงบแห่งชาติ ที่ 78/2559 เรื่อง มาตรการแก้ไขปัญหาการเชื่อมต่อระบบรถไฟฟ้าโครงการรถไฟฟ้าสายสีน้ำเงิน (สายเฉลิมรัชมงคล) ช่วงหัวลำโพง - บางซื่อ และโครงการรถไฟฟ้าสายสีม่วง ช่วงบางใหญ่ - บางซื่อ" (PDF). Royal Thai Government Gazette (in Thai). 133 (Special 310 D): 1–2. 2016-12-28. Archived from the original (PDF) on January 10, 2017.
  6. ^ "Purple Line to connect with MRT on Aug 11". Bangkok Post.
  7. ^ "Free travel between new BTS, MRT train stations". Bangkok Post. Retrieved 2020-04-23.
  8. ^ "Cabinet gives green light for MRTA's South Purple Line". www.nationthailand.com. 25 July 2017. Retrieved 2020-04-23.
  9. ^ Chantanusornsiri, Wichit. "Purple Line, Phuket light rail among projects up for PPP". Bangkok Post. Retrieved 2020-04-23.
  10. ^ "ครม.ไฟเขียวรถไฟฟ้าม่วงใต้ 1.101 แสนล้าน "อาคม" จ่อชงอีก 4 สายครบโครงข่าย". mgronline.com (in Thai). 2017-07-25. Retrieved 2021-12-27.
  11. ^ "4 บริษัท ยื่นข้อเสนอประกวดราคาจ้างก่อสร้างงานโยธา #โครงการรถไฟฟ้าสายสีม่วง ช่วงเตาปูน – ราษฎร์บูรณะ (วงแหวนกาญจนาภิเษก)". Facebook (in Thai). Retrieved 2021-12-27.
  12. ^ "มาจริงไม่จกตา! 2ขั้วช.การช่าง-ซิโนกับITD-เนาวรัตน์". Facebook (in Thai). Retrieved 2021-12-27.
[edit]

13°48′22″N 100°31′51″E / 13.8062°N 100.5308°E / 13.8062; 100.5308