Length132 km[1] (82 mi)
Location
CountryIreland
Primary
destinations
(bypassed towns in italics)[2]
† Bypasses planned.
Highway system

The N5 road is a national primary road in Ireland, connecting Longford town with Westport. It is the main access route from Dublin (via the M4/N4) to most of County Mayo, including the county's largest towns, Castlebar, Ballina (via the N26), and Westport.

Almost all of the route has been improved in the 21st century, with the construction of bypasses and extensive resurfacing works on stretches not bypassed. From Longford, the N5 passes through Strokestown and close to Ballaghaderreen, before crossing the N17 at an interchange near Ireland West Airport and continuing westward to bypass Swinford and Castlebar before terminating in Westport. The N26 to Ballina leaves the N5 just outside Swinford. The road is 132 kilometres (82 mi) long.[1]

Standard of route

[edit]

The majority of the N5 is a two-lane single carriageway, however a 20km section from Westport to the Castlebar East roundabout is a four-lane dual carriageway without hard shoulders. The single carriageway section has wide driving lanes and hard shoulders for 60 km (37 mi) between Castlebar East and Tibohine, near Frenchpark, and between Strokestown and Longford for 20 km (12 mi). The remainder of the route – between Frenchpark and Strokestown – consists of a narrow road with no hard shoulders, and with a poor horizontal and vertical alignment allowing few overtaking opportunities. Construction work to upgrade this section is due to start in 2023 (see below).

Campaign to upgrade route

[edit]

The standard of the N5 road is a significant political issue in Mayo. Local politicians have argued that because the N5 is the main access route to the county, it should be upgraded to a consistent standard - a single carriageway road with hard shoulders, bypassing all towns along the route.

Political arguments were given more weight in recent years when several major multinational firms based in Mayo joined forces to lobby the government to upgrade the N5. The Mayo Industries Group is made up of household names including Coca-Cola (through its Mayo subsidiary Ballina Beverages), Allergan Pharmaceuticals, Baxter and Hollister. The group has met with senior government ministers on several occasions in an attempt to secure funding for further improvements to the road.[3]

Completed schemes

[edit]

Westport – Turlough

[edit]

This 25.5 km (15.8 mi) comprises a 20km dual carriageway from Westport to the existing N5 near Turlough, bypassing Castlebar, as well as a single carriageway relief road around Westport and the realignment of 2.5km of the N59 road north of the town. An Bórd Pleanala approved the route in May 2014. Contracts were signed in October 2019 for the construction of the project.[4] The Castlebar bypass opened on 26 April 2023, with the remainder of the route to Westport opening on 15 June that year.[5] The original N5 road has been redesignated as a regional route, the R309.

Ballaghaderreen bypass

[edit]

This scheme comprises 13.6 km (8.5 mi) of standard single carriageway and provides a bypass to the north of Ballaghaderreen town. The project includes realignment/bridging of local roads and a major grade separated junction between the N5 and R293 to provide access to the town. An Bord Pleanála approved the scheme in 2008. Transport Minister Leo Varadkar turned the first sod on the project on 2 November 2012, and the road was opened on 2 September 2014 by Taoiseach Enda Kenny.[6]

Longford bypass

[edit]

This is a 2.6 km (1.6 mi) standard single carriageway link between the N4 and the existing N5. It provides a bypass to the northwest of Longford town so that traffic between Dublin and Mayo no longer has to pass through Longford town centre. The scheme includes rail and river bridge crossings and access is restricted to the roundabouts at either end of the scheme. Construction commenced in April 2011[7] and the road opened to traffic on 3 August 2012.[8]

Charlestown bypass

[edit]

An 18 km (11 mi) long single carriageway bypass of Charlestown, from east of Carracastle to the end of the Swinford bypass at Cloonlara, began construction in March 2006 and opened on 2 November 2007. It cost €81 million to build.

It is named the John Healy Road in honour of the late Irish Times journalist who wrote about the economic decline of Charlestown in the 1960s.

Scramoge – Cloonmore

[edit]

An 8 km (5 mi) stretch of standard single carriageway between Strokestown and Longford commenced construction in September 2001 and was officially opened on 10 May 2004 at a cost of €21 million. The project includes two river bridges, one rail bridge, 500 metres of culverts and 600,000 cubic metres of earthworks - including excavation of 350,000 cubic metres of peat.

Swinford bypass

[edit]

A 5 km (3.1 mi) single carriageway bypass of Swinford was completed in 1996. It incorporates a major junction with the N26 road to Ballina. The junctions on this scheme are all at-grade and this has led to safety concerns, with high collision rates at the R320, R375 and N26 junctions. The singer Ronan Keating's brother was killed in one of the numerous fatal collisions along this part of the N5, leading to repeated calls from the Mayo county coroner for safety improvements to be made. [1] There is a proposal to grade separate these junctions by providing overbridges for crossing traffic. [2]

Castlebar – Turlough

[edit]

This 10 km (6.2 mi) single carriageway includes a bypass of Turlough village and a relief road around Castlebar which opened in 1990. The western end of this scheme, including the Castlebar relief road, was itself bypassed and redesignated as the R309 after the 2023 opening of the Turlough to Westport dual-carriageway.[9]

Schemes in planning or construction

[edit]

Scramoge – Ballaghaderreen

[edit]

The project involves the upgrade of the N5 in County Roscommon between Rathkeery at the eastern end of the Ballaghaderreen bypass and Scramoge, east of Strokestown. It will bypass Frenchpark, Bellanagare, Tulsk and Strokestown. The planned route, a 33 km (21 mi) stretch of single carriageway, was approved by An Bord Pleanala in January 2019.[10] Contracts for the construction of the project were signed in October 2021, with Roadbridge awarded the contract. However, Roadbridge collapsed in March 2022.[11] The project was re-tendered and construction was due to start in late 2023.[12] Contracts were signed with Wills Bros, the new contractor, on 8 December 2023.[3]

Turlough – Bohola

[edit]

The Turlough to Bohola road scheme will facilitate the upgrade of the N5 from east of Castlebar to east of Bohola. The project will combine an online upgrade of the existing N5 west of Bellavary with offline bypasses of both Bellavary and Bohola. A preferred route corridor has been selected.[13]

Route through Longford and Roscommon

[edit]
The N5 near Tulsk, County Roscommon in 2006, before upgrade works

The N5 leaves the N4 on the northwest side of Longford. The first 3 km (1.9 mi) of the route follows a new bypass road that was completed in August 2012. Approximately 8 km (5.0 mi) west of the town, the N5 crosses the River Shannon into County Roscommon at Tarmonbarry Bridge. The road passes by Scramoge along a realignment (opened in May 2004) on the way to Strokestown. West of Strokestown, at Tulsk, the N61 crosses the N5. The route continues northwest and passes north of Ballaghaderreen (alignment opened in 2014) before crossing into County Mayo.

Route through Mayo

[edit]

The N5 continues west bypassing Carracastle and Charlestown (bypass opened 2007). The N17 crosses the route near Charlestown. The N26 joins the N5 at Cloonlara just east of Swinford (bypassed to the south by the N5 Swinford Bypass). The N5 runs west/southwest through Bohola to Bellavary, where it meets the N58. The N5 continues west towards Castlebar, where it bypasses the town on the southeastern side as a dual carriageway, with grade-separated junctions for the N60 (for Roscommon town via Claremorris and Ballyhaunis) and N84 (for Galway via Ballinrobe and Headford) roads. The dual carriageway ends at a roundabout on the outskirts of Westport, while the N5 continues as a single carriageway, bypassing Westport to the north, before terminating at a roundabout junction with the N59. The N5 is County Mayo's busiest road with traffic counts of almost 10,000 vehicles per day between Westport and Bellavary. Conversely, some parts of the route through County Roscommon have less than 5,000 vehicles daily (https://www.tii.ie/tii-library/strategic-planning/tii-road-network-indicators/TII-National-Roads-Network-Indicators-2022.pdf)

See also

[edit]

References

[edit]
  1. ^ a b "N5, Co. Longford to Octagon, Westport" (Map). Google Maps. Retrieved 6 January 2017.
  2. ^ "S.I. No. 53/2012 – Roads Act 1993 (Classification of National Roads) Order 2012". Government of Ireland. 28 February 2012. Archived from the original on 18 August 2016. Retrieved 6 January 2017.
  3. ^ "Taoiseach meets Mayo deputation on N5 concerns". Mayo Advertiser. 22 October 2010. Archived from the original on 8 January 2017. Retrieved 6 January 2017.
  4. ^ "BAM Wills JV awarded contract for N5 Westport to Turlough Road". BAM Ireland. 1 November 2019. Archived from the original on 17 November 2019. Retrieved 8 December 2019.
  5. ^ "€250 Million N5 Westport To Turlough Road Project Opened By Taoiseach -". www.tii.ie. Retrieved 25 August 2023.
  6. ^ "Work starts on Ballaghaderreen Bypass". Archived from the original on 1 December 2012. Retrieved 3 November 2012.
  7. ^ "N5 Longford Bypass". Longford Co. Council. November 2011. Archived from the original on 15 January 2012. Retrieved 6 January 2017.
  8. ^ "N5 Longford Bypass – Opens Friday, August 3rd". Transport Infrastructure Ireland (Press release). Archived from the original on 16 November 2017. Retrieved 1 January 2019.
  9. ^ "R309 - Roader's Digest: The SABRE Wiki". www.sabre-roads.org.uk.
  10. ^ "Announcement of N5 Ballaghaderreen to Scramoge Road Project". Government of Ireland. 7 May 2019. Archived from the original on 8 December 2019. Retrieved 8 December 2019.
  11. ^ "Roadbridge receivership followed failed rescue takeover talks". The Irish Times. Retrieved 25 August 2023.
  12. ^ "Budget 2023 continues to keep costs down for commuters and ensures that transport developments can continue at pace". www.gov.ie. 27 September 2022. Retrieved 25 August 2023.
  13. ^ "N5 / N26 / N58 Castlebar East to Bohola and Swinford to Mount Falcon Road Project". MayoCoCo. Retrieved 25 August 2023.