Line 3 (Xuzhou Metro)
Appearance
Line 3 | |
---|---|
3 | |
Overview | |
Native name | 徐州地铁3号线 |
Status | Operational |
Locale | Xuzhou, Jiangsu |
Termini | |
Stations | 16 |
Service | |
Type | Rapid transit |
System | Xuzhou Metro |
Rolling stock | Type B (CRRC Nanjing Puzhen)[1] |
History | |
Opened | June 28, 2021 |
Technical | |
Line length | 18.3 km (11.4 mi) |
Number of tracks | 2 |
Character | Underground |
Operating speed | 80 km/h (50 mph) |
Line 3 of the Xuzhou Metro (Chinese: 徐州地铁3号线) is a rapid transit line in Xuzhou city, Jiangsu province, China. It is the third metro line to open in Xuzhou.
History
[edit]Phase 1
[edit]Phase 1 of Line 3 was opened on June 28, 2021.[2][3]
Phase 2
[edit]Phase 2 of Line 3 is expected to open in 2025. It will add 6 stations (5 stations in the Northern extension and 1 station in the Southern extension).[4]
Stations
[edit]Station name | Connections | Distance km |
Location | ||
---|---|---|---|---|---|
English | Chinese | ||||
Zhenxingdadao | 振兴大道[4] | ||||
Pantao | 蟠桃[4] | ||||
Higher Vocational School of Economics & Trading | 经贸学校[4] | ||||
Jinshanqiao | 金山桥[4] | ||||
Yangzhuang | 杨庄[4] | ||||
Xiadian | 下淀 | 0 | 0 | Gulou | |
Baiyunshan | 白云山 | ||||
Xuzhou Railway Station | 徐州火车站 | 1 XCH | |||
Tianqiao | 天桥 | Yunlong | |||
Hepingdaqiao | 和平大桥 | ||||
Huaita | 淮塔 | 2 | Quanshan | ||
CUMT Wenchang Campus | 矿大文昌校区 | ||||
Nansanhuanlu | 南三环路 | ||||
Zhaishan | 翟山 | ||||
Jiangsu Normal University | 师范大学 | Tongshan | |||
Yuquanhe | 玉泉河 | ||||
Wumingshan Park | 无名山公园 | ||||
Pujianglu | 浦江路 | ||||
Jiaoshan | 焦山 | ||||
Qianjianglu | 钱江路 | ||||
Gaoxinqu'nan | 高新区南 | ||||
Yinshan | 银山[4] | ||||
References
[edit]- ^ "Xuzhou Metro's Line 3 receives first electric train". world-trader.com. 2020-07-30. Retrieved 2022-05-27.
- ^ "定了!徐州地铁三号线28号上午开通". 2021-06-24.
- ^ "建设进入新阶段 徐州地铁3号线首台盾构机始发". 2018-01-09.
- ^ a b c d e f g "关于徐州市城市轨道交通3号线二期、6号线一期工程车站命名的公告". Archived from the original on 2023-05-03.