[go: up one dir, main page]

Jump to content

Line 17 (Shenzhen Metro)

From Wikipedia, the free encyclopedia
Line 17
17
Overview
StatusUnder construction
LocaleShenzhen, Guangdong
Termini
Stations18 (Phase 1)
Service
TypeRapid transit
SystemShenzhen Metro
Services1
Operator(s)SZMC (Shenzhen Metro Group)
History
Planned openingJune 2029; 4 years' time (2029-06)
Technical
Line length18.8 km (Phase 1)
CharacterUnderground

Line 17 (simplified Chinese: 十七号线; traditional Chinese: 十七號線; pinyin: Shíqī Hàoxiàn; Jyutping: Sap6 Cat1 Hou6 Sin3) of the Shenzhen Metro is a Phase V expansion metro line under construction in the eastern Shenzhen districts of Luohu and Longgang. Construction on Phase 1 started on 10 October 2023, and the line is expected to open in June 2029, which will run from Luohu West in Luohu District to Shanglilang in Longgang District, with 18 stations and 18.8 kilometers of track.[1][2]

Stations (Phase 1)

[edit]
Station name Connections Location
English Chinese
Luohu West 罗湖西 1 (via Luohu) Luohu
Jiabin 嘉宾
Laojie 老街 1 3
Datanglong 大塘龙
Sungang 笋岗 7
Liyuan 梨园
Luohu North 罗湖北 14
Luohu North railway station Luohu North (U/C)
Dexing 德兴
Luogang 罗岗 Longgang
Baigelong 百鸽笼 5
Qiushuishan 求水山
Nanling 南岭
Nanling Center 南岭中心
Danzhutou 丹竹头 3
Shiyaling 石芽岭 14
Xialilang 下李朗
Shenlang 深朗
Shanglilang 上李朗 10

References

[edit]
  1. ^ "深圳13条规划地铁新线的具体走向和站点设置公布". 2022-09-07. 地铁17号线一期由罗湖西至上李朗,设站18座,线路总长约18.8公里,全线采用地下敷设方式
  2. ^ 深圳地铁五期规划建设13条线路 年底运营里程将破500公里. new.qq.com. 2022-09-07.