[go: up one dir, main page]

Jump to content

JEA

From Wikipedia, the free encyclopedia
JEA, Inc.
Company typePublic-benefit
IndustryPublic Utility
PredecessorCity of Jacksonville Electric Department (electricity, prior to 1968)
Department of Public Utilities (water and sewer, prior to 1997)
Jacksonville Electric Authority[1]
Founded1968
HeadquartersJacksonville, Florida
Key people
Vickie Cavey, CEO and MD [2]
ProductsElectric utility
Drinking water
Sewage treatment
Chilled water
Reclaimed water
Total assets$7.9 billion (2021)
Total equity$3.5 billion (2021)
Number of employees
2,000 approximate (2021)
Websitewww.jea.com

JEA, located in Jacksonville, Florida, is the eighth-largest community-owned electric utility company in the United States and the largest in Florida. As of 2022, JEA served more than 1 million Northeast Florida residents with electric, water, sewer and reclaimed water services. JEA also provides some customers with natural gas sales, and access to dark fiber. In addition, JEA works with the City of Jacksonville to maintain its streetlight system. Besides Jacksonville (Duval County), JEA also serves customers in Clay, Nassau and St. Johns counties.

History

[edit]

Jacksonville's water and sewer systems have been operated by the city since 1880.

City of Jacksonville Electric Department

[edit]

In 1895, the first electric power station, Main Street Power Plant comes online, providing night-time lighting for the first time to downtown.

In 1943, the Baldwin Interconnector comes online, providing backup power to nearby Naval Air Station Jacksonville and Camp Blanding.

In 1950, the Southside Generating Station comes online, and is hooked up to the city's electric grid.

On September 9, 1964, Hurricane Dora devastates 95 percent of the city's electric grid.

Jacksonville Electric Authority

[edit]

On August 8, 1967, as part of the consolidation of the City of Jacksonville and Duval County governments, the City of Jacksonville Electric Department became an independent body, renamed Jacksonville Electric Authority, now operating in accordance with Article 21 of the Jacksonville Code of Ordinance.

According to Article 21 of the Jacksonville City Charter,

"JEA is authorized to own, manage and operate a utilities system within and outside the City of Jacksonville. JEA is created for the express purpose of acquiring, constructing, operating, financing and otherwise have plenary authority with respect to electric, water, sewer, natural gas and such other utility systems as may be under its control now or in the future."[3]

During the 1970s, JEAs electric rates were among the highest in the nation.[4] Royce Lyles became JEA Managing Director on September 1, 1979 and the utility began diversifying its fuel mix. Rates began to drop, eventually becoming the lowest in the state and near the bottom in the Southeast.[5]

Walt Bussells was appointed Managing Director on September 8, 1995, following Royce Lyles' retirement.

On June 1, 1997, Jacksonville's Department of Public Utilities, water and sewer operations merged into the Jacksonville Electric Authority. The utility subsequently became known as JEA as it provided a broader range of services beyond electric service.

Bussells embraced new technology and in 2002, JEA introduced online bill payment and implemented network meter reading. In 2003, JEA’s first chilled water facility became fully operational and began providing chilled water for air conditioning in downtown buildings. Since then, JEA has completed three additional facilities and has contracts to provide sixteen (16) locations with chilled water. Chilled water clients include Vystar Veterans Arena, 121 Financial Ballpark, Downtown Public Library, State Attorney Office, Duval County Courthouse and UF Health Hospital Campus, among others.

During Bussells's tenure, Jacksonville's electric rates had remained artificially low throughout the 1990s and into the 2000s, despite large expenditures following the water/sewer acquisition in 1997, technology improvements, and construction of chilled water equipment. These projects were financed with borrowed money.

Jim Dickenson replaced Walt Bussells when Bussells retired on June 15, 2004 after nine years as CEO.[6] Soon after taking over, Dickenson implemented the first of three temporary fuel rate increases to offset rising fuel costs. In 2007, JEA had the second-lowest electric rates in Florida before they announced a four-year base rate increase package that would raise the average bill from $112 to more than $140 in 2010.[7] The additional revenue was designed to reduce debt.

The utility's debt in 2010 was $6.0 billion, against assets of $7.5 billion. Compared to other similar sized municipal utilities, JEA had 60% more debt per customer, which could lower the utility's bond rating and make it more expensive and difficult to borrow money.[8]

In early 2012, Dickenson announced that he would retire February 1, 2013.[9] On September 7, 2012 JEA Board of Directors named Paul McElroy to fill the role of JEA CEO and Managing Director effective October 1, 2012.[10]

In October 2012, Paul McElroy signed a 3-year contract to serve as JEA's CEO and this contract has been extended once; it ends in September 2018.[11]

Aaron Zahn served as CEO from April, 2018 until his termination on January 28, 2020.

COO Melissa Dykes was elevated to Managing Director & CEO on an interim basis until May 5, 2020, when Paul McElroy returned to lead JEA until a permanent replacement was selected. In June 2020, McElroy placed the majority of the leadership team that served under Zahn on paid administrative leave and appointed interim leaders.   

Jay Stowe was named Managing Director & CEO in November 2020. Stowe’s new seven-member leadership team was in place by September 2021. Following Stowe's resignation in April 2024,[12] JEA veteran Vickie Cavey was named Interim Managing Director & CEO, and she was elevated to the permanent role[13] in September 2024.


Attempted sale and aftermath

[edit]

In early 2018, JEA's board of directors became interested in potentially selling the publicly owned JEA.[14]

In late December 2019, a state investigation of JEA's CEO and board of directors launched in response to complaints to the previously mentioned selling of JEA. The State Attorney's Office turned over its investigation to the U.S. Attorney and the FBI, resulting in a federal grand jury indicting former CEO Zahn and former CFO Ryan Wannemacher on charges of conspiracy and wire fraud in 2022. Following a trial, Zahn was found guilty of both charges in March 2024 and sentenced to four years in prison, while Wannemacher was found not guilty on both counts[15].

Services

[edit]
  • Electricity: JEA owns/operates four generating plants and all transmission and distribution facilities; JEA previously co-owns two additional power plants with Florida Power & Light: the St. Johns River Power Park in northeastern Jacksonville and Unit 4 of Plant Scherer, near Macon, Georgia, both retired on 1/1/2018 and 1/1/2022, respectively.
  • Water: 134 artesian wells tapping the Floridan Aquifer are distributed through 35 water treatment plants and 4,208 miles (6,772 km) of water lines.
  • Sewer: 3,760 miles (6,050 km) of collection lines and seven regional and eight non-regional sewage treatment plants.
  • Chilled water: the company owns one chiller plant in downtown Jacksonville which provides the commodity to nearby facilities to heat and cool their buildings' air and equipment.

See also

[edit]

References

[edit]
  1. ^ "The Jacksonville City Council approves a charter amendment to change the name of the Jacksonville Electric Authority to its acronym, JEA". September 23, 1998. Archived from the original on 2018-07-03. Retrieved 2018-07-02.
  2. ^ "Vickie Cavey becomes first woman to serve as permanent JEA CEO | Jacksonville.com". 24 September 2024.
  3. ^ "Article 21. -JEA" Municode website, Jacksonville City Charter
  4. ^ "JEA: Cutting debt, stabilizing rates". jacksonville.com. Retrieved 2017-09-12.
  5. ^ "Putting the customers first, always". www.energycentral.com. Energy Central. September 20, 2011. Retrieved September 11, 2017.
  6. ^ Hunt, David: Hunt, David (April 29, 2010). "There's more behind a man than CEO: JEA's Jim Dickenson". Florida Times-Union. Retrieved September 11, 2017.
  7. ^ Galnor, Matt (July 27, 2007). "What's the market value of JEA?". Florida Times Union. Retrieved September 11, 2017.
  8. ^ "Fitch Rates JEA/St. Johns River Power Park". Business Wire. ADVFN. May 3, 2010. Retrieved September 11, 2017.
  9. ^ Palka, Mary Kelli (January 17, 2012). "JEA chief executive Jim Dickenson says he will retire next year". Florida Times-Union. Retrieved September 11, 2017.
  10. ^ JEA Board of Directors Names McElroy New CEO jea.com
  11. ^ JEA negotiating extension of CEO Paul McElroy's contract Retrieved April 5, 2018
  12. ^ JEA Board Names Vickie Cavey Interim Managing Director and CEO Retrieved December 2, 2024
  13. ^ Vickie Cavey becomes first woman to serve as permanent JEA CEO Retrieved December 2, 2024
  14. ^ Simmons, Ryan Benk, Joslyn (29 March 2018). "JEA's CEO Says He Has Nothing To Hide, Giving City Council 22,000 Pages Of Documents".{{cite web}}: CS1 maint: multiple names: authors list (link)
  15. ^ Former JEA CEO Aaron Zahn guilty, ex-CFO Ryan Wannemacher not guilty in fraud trialRetrieved December 2, 2024
[edit]