East Sitra City
East Sitra City (Arabic: مدينة شرق سترة) | |
---|---|
General information | |
Location | Sitra, Bahrain |
Coordinates | 26°07′N 50°39′E / 26.12°N 50.65°E |
Area | 540 hectares (1,300 acres) |
Construction | |
Architect | WS Atkins |
East Sitra City (Arabic: مدينة شرق سترة) is a proposed public housing mega-project under construction in the Kingdom of Bahrain. Proposed in 2014 by the Bahraini Ministry of Housing, the project involves land reclamation of 253 to 540 hectares (5.8 million square metres)[1] off the eastern coast of Sitra island.[2] Once completed, the reclaimed islands are estimated to consist of 3,157 housing units,[3] serving more than 20,000 citizens.[4]
The project is part of a concurrent series of 245 million BHD ($649 million) public housing projects launched in the country in the 2010s, such as the Northern City and East Hidd City.[5]
Construction
[edit]The project plans for six separate man-made islands to be reclaimed from the sea, off the east coast of Sitra. It is estimated that up to 600 hectares of land would be reclaimed. AECOM are the chief planners of the project.[6] Nature Environmental Studies and Consultations served as environmental consultants, WS Atkins & Partners Overseas are the architects, and Masterplan and Infrastructure served as design consultant.[1] The city will include a 2.6km seafront and 13km of bicycle lanes.[4][7] 255 hectares were donated by the King Hamad bin Isa Al Khalifa. The reclamation work was assigned to the National Marine Dredging Company (NMDC).[8]
An estimated 25 million cubic metres of dredged sand were required to reclaim land. In addition to serving as a housing project, the city will host facilities for Bahrain's oil sector and other government use.[9]
In June 2014, the Ministry of Housing of Bahrain signed the agreement to draw the detailed blueprint of the project.[8] In June 2015, Prince Salman bin Hamad Al Khalifa laid the first stone of the project.[10] The construction has been awarded to the Chinese company China Machinery Engineering Corporation in December 2019.[11] The construction project has three phases. Phase 1 (construction of 1,077 units) started in December 2020.[4][7] Phase 2 will see the construction of 1,800 units, and phase 3 of a further 500 units.[12]
See also
[edit]- East Hidd City, a concurrent housing project under construction on reclaimed land.
References
[edit]- ^ a b "Bahrain MOH - East Hidd and East Sitra Project - Details on ZAWYA MENA Edition". www.zawya.com. Retrieved 18 October 2019.
- ^ "East Sitra Master Plan". Gulf House Engineering. Archived from the original on 23 September 2021. Retrieved 18 October 2019.
- ^ East Sitra Town, Housing.gov.bh
- ^ a b c Disha Dadlani, Construction on $689.6m East Sitra Housing Project begins, Constructionweekonline.com, 28 December 2020
- ^ "Work on track at new towns in Bahrain". Zawya. 30 July 2019. Retrieved 18 October 2019.
- ^ "East Sitra". www.aecom.com. Retrieved 18 October 2019.
- ^ a b Housing Minister visits East Sitra Town project Archived 2022-01-01 at the Wayback Machine, Bna.bh, 4 April 2021
- ^ a b Ministry of Housing to Build 5,000 Homes in Sitra , Medium.com, 16 June 2014
- ^ "NMDC". www.nmdc.com. Retrieved 18 October 2019.
- ^ HRH Crown Prince lays first stone of the East Sitra housing project, Crownprince.bh, 15 June 2015
- ^ Bahrain awarded a contract of $690 million for construction of East Sitra housing project, Saudigulfprojects.com, 9 December 2019
- ^ BD260m East Sitra City project is progressing according to timetable, Newsofbahrain.com, 22 July 2021