dbo:abstract
|
- The MRT Pink Line is an elevated mass rapid transit monorail train line under construction in Bangkok and Nonthaburi Province, Thailand. The monorail line will be 34.5 kilometres (21.4 mi) long and have 30 stations. It will run in the northern part of the city from the Nonthaburi Civic Center in Pak Kret District Nonthaburi along the major east–west transport corridor of Chaeng Wattana and Ram Intra roads to terminate at Minburi District in east Bangkok. The line is designed to link the northern areas of Bangkok and Nonthaburi by connecting with five mass transit lines. At Nonthaburi Civic Center the line interchanges with the MRT Purple Line and the proposed MRT Brown Line. The line also interchanges with the SRT Dark Red Line, the BTS Sukhumvit Line and the planned BMA Grey Line. At the Min Buri terminus, the line interchanges with the under construction MRT Orange Line. Construction of the MRT Pink Line began in December 2017. In October 2020, the BSR consortium stated that they aimed to open the first section of the Pink Line by October 2021, with services initially operating from Min Buri (PK30) to Government Complex (PK12). The complete line was originally set to be fully open by June 2022. However, the outbreak of COVID-19 in Bangkok and changes to station locations has delayed the opening date. On 24 September 2021, the MRTA Board granted a 290-day extension to the construction contract period. In November 2021, the MRTA Board approved a new phased opening of the line starting from August 2022. On 9 December 2021, daily testing conducted at a maximum speed of 25 km/h began on a short 4 km section of the line between the depot at Min Buri and Bang Chan station. After a period of 3 months, testing will be conducted at higher speeds and along a longer section of track. However, in mid April 2022 the acting Director-General of the Department of Rail Transport stated that the line would not begin full testing until September 2022 and that the first stage would not open until late December 2022. By the end of March 2022, construction progress is at 86.51%. The line will open in three stages.
* Phase 1: December 2022 - Min Buri (PK30) to Government Complex (PK12) (except Nopparat (PK26)) - 21 km
* Phase 2: March 2023 - Government Complex (PK12) to Royal Irrigation Department (PK05) - 8 km
* Phase 3: July 2023 - Royal Irrigation Department (PK05) to Nonthaburi Civic Center (PK01) - 5.5 km (en)
- ピンクラインは、タイ王国首都バンコクのモノレール路線である。国営交通公社MRTA(英語: Mass Rapid Transit Authority of Thailand)が路線の建設や施設の保有を行い、合弁事業BSRが出資する民間企業ノーザン・バンコク・モノレール株式会社が運営する上下分離方式の導入により、2022年現在、建設が進んでいる。 2022年に先行開業区間の営業開始、2023年に本線の全線開通が予定されている。 「en:MRTA_Pink_Line」も参照 (ja)
- 曼谷单轨铁路粉红线(泰语:สายสีชมพู,音素換寫:S̄āy s̄īchmphū)是泰国交通与运输计划措施局的发展城乡重要的项目之一,规定本线路运用单轨铁路形式,原因既是利用少量空间,建设快捷用处很多,不需要拆除过朗四十字路口的桥道,目前在于2017年7月开始兴建路线,并在2020年之内正式开通运营。 据悉2017年5月30日,由现任泰国军方政府国家维和委员会巴育与有关人员通过谈判所得出结论,同意并批准本线及曼谷单轨铁路黄线(勒抛-三龙专线)及曼谷单轨铁路粉红线(暖武里行政中心-民武里专线)受予私人企业进行投资建设并进行双方合资,2017年7月,开始兴建路线。 (zh)
|
dbo:isPartOf
| |
dbo:lineLength
|
- 34500.000000 (xsd:double)
|
dbo:location
| |
dbo:numberOfStations
|
- 30 (xsd:nonNegativeInteger)
|
dbo:owner
| |
dbo:railwayRollingStock
| |
dbo:routeEnd
| |
dbo:routeStart
| |
dbo:status
| |
dbo:thumbnail
| |
dbo:type
| |
dbo:wikiPageExternalLink
| |
dbo:wikiPageID
| |
dbo:wikiPageLength
|
- 30675 (xsd:nonNegativeInteger)
|
dbo:wikiPageRevisionID
| |
dbo:wikiPageWikiLink
| |
dbp:character
| |
dbp:depot
| |
dbp:electrification
| |
dbp:end
| |
dbp:locale
|
- Nonthaburi and Bangkok, Thailand (en)
|
dbp:logo
| |
dbp:logoWidth
| |
dbp:mapState
| |
dbp:operator
|
- Northern Bangkok Monorail Company Limited (en)
|
dbp:owner
| |
dbp:planopen
| |
dbp:signalling
|
- Bombardier CITYFLO 650 moving block CBTC ATC under ATO GoA 3 , with subsystems of ATP, ATS and CBI (en)
|
dbp:start
| |
dbp:stations
| |
dbp:status
| |
dbp:stock
|
- 4 (xsd:integer)
- Bombardier Innovia Monorail 300 (en)
|
dbp:system
| |
dbp:tracks
| |
dbp:type
| |
dbp:wikiPageUsesTemplate
| |
dct:subject
| |
rdf:type
| |
rdfs:comment
|
- ピンクラインは、タイ王国首都バンコクのモノレール路線である。国営交通公社MRTA(英語: Mass Rapid Transit Authority of Thailand)が路線の建設や施設の保有を行い、合弁事業BSRが出資する民間企業ノーザン・バンコク・モノレール株式会社が運営する上下分離方式の導入により、2022年現在、建設が進んでいる。 2022年に先行開業区間の営業開始、2023年に本線の全線開通が予定されている。 「en:MRTA_Pink_Line」も参照 (ja)
- 曼谷单轨铁路粉红线(泰语:สายสีชมพู,音素換寫:S̄āy s̄īchmphū)是泰国交通与运输计划措施局的发展城乡重要的项目之一,规定本线路运用单轨铁路形式,原因既是利用少量空间,建设快捷用处很多,不需要拆除过朗四十字路口的桥道,目前在于2017年7月开始兴建路线,并在2020年之内正式开通运营。 据悉2017年5月30日,由现任泰国军方政府国家维和委员会巴育与有关人员通过谈判所得出结论,同意并批准本线及曼谷单轨铁路黄线(勒抛-三龙专线)及曼谷单轨铁路粉红线(暖武里行政中心-民武里专线)受予私人企业进行投资建设并进行双方合资,2017年7月,开始兴建路线。 (zh)
- The MRT Pink Line is an elevated mass rapid transit monorail train line under construction in Bangkok and Nonthaburi Province, Thailand. The monorail line will be 34.5 kilometres (21.4 mi) long and have 30 stations. It will run in the northern part of the city from the Nonthaburi Civic Center in Pak Kret District Nonthaburi along the major east–west transport corridor of Chaeng Wattana and Ram Intra roads to terminate at Minburi District in east Bangkok. (en)
|
rdfs:label
|
- バンコクモノレールピンクライン (ja)
- Pink Line (Bangkok) (en)
- 曼谷单轨铁路粉红线 (zh)
|
owl:sameAs
| |
prov:wasDerivedFrom
| |
foaf:depiction
| |
foaf:isPrimaryTopicOf
| |
is dbo:wikiPageDisambiguates
of | |
is dbo:wikiPageRedirects
of | |
is dbo:wikiPageWikiLink
of | |
is foaf:primaryTopic
of | |