[go: up one dir, main page]

An Entity of Type: infrastructure, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

Irvington is a planned Bay Area Rapid Transit (BART) infill station in the Irvington District of Fremont, California. As of November 2022, estimates from the city anticipated construction to begin in 2024, with the station opening for service in 2031.

Property Value
dbo:abstract
  • Irvington is a planned Bay Area Rapid Transit (BART) infill station in the Irvington District of Fremont, California. As of November 2022, estimates from the city anticipated construction to begin in 2024, with the station opening for service in 2031. (en)
dbo:address
  • Osgood Road at Washington Boulevard (en)
dbo:numberOfTracks
  • 2 (xsd:nonNegativeInteger)
dbo:stationStructure
  • At-grade
dbo:thumbnail
dbo:wikiPageExternalLink
dbo:wikiPageID
  • 31787879 (xsd:integer)
dbo:wikiPageLength
  • 9458 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1122778155 (xsd:integer)
dbo:wikiPageWikiLink
dbp:address
  • Osgood Road at Washington Boulevard (en)
dbp:borough
dbp:caption
  • Aerial view of the planned station site, in June 2017 (en)
  • A 1980 map showing proposed BART extensions, featuring Irvington (en)
dbp:disabled
  • Yes (en)
dbp:float
  • left (en)
dbp:height
  • 170 (xsd:integer)
dbp:imageLeft
  • -390 (xsd:integer)
dbp:imageTop
  • -500 (xsd:integer)
dbp:imageWidth
  • 620 (xsd:integer)
dbp:mapframe
  • yes (en)
dbp:mapframeZoom
  • 14 (xsd:integer)
dbp:name
  • Irvington (en)
dbp:otherServicesHeader
  • Proposed services (en)
dbp:platforms
  • 2 (xsd:integer)
dbp:status
  • design stage (en)
dbp:structure
  • At-grade (en)
dbp:style
  • BART (en)
dbp:symbol
  • yes (en)
dbp:symbolLocation
  • BART (en)
dbp:tracks
  • 2 (xsd:integer)
dbp:width
  • 200 (xsd:integer)
dbp:wikiPageUsesTemplate
dcterms:subject
georss:point
  • 37.5318 -121.9537
rdf:type
rdfs:comment
  • Irvington is a planned Bay Area Rapid Transit (BART) infill station in the Irvington District of Fremont, California. As of November 2022, estimates from the city anticipated construction to begin in 2024, with the station opening for service in 2031. (en)
rdfs:label
  • Irvington station (BART) (en)
owl:sameAs
geo:geometry
  • POINT(-121.95369720459 37.531799316406)
geo:lat
  • 37.531799 (xsd:float)
geo:long
  • -121.953697 (xsd:float)
prov:wasDerivedFrom
foaf:depiction
foaf:isPrimaryTopicOf
foaf:name
  • Irvington (en)
is dbo:wikiPageDisambiguates of
is dbo:wikiPageRedirects of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License