[go: up one dir, main page]

An Entity of Type: Rule105846932, from Named Graph: http://dbpedia.org, within Data Space: dbpedia.org

The Graphical Path Method (GPM) is a mathematically based algorithm used in project management for planning, scheduling and resource control. GPM represents logical relationships of dated objects – such as activities, milestones, and benchmarks – in a time-scaled network diagram.

Property Value
dbo:abstract
  • The Graphical Path Method (GPM) is a mathematically based algorithm used in project management for planning, scheduling and resource control. GPM represents logical relationships of dated objects – such as activities, milestones, and benchmarks – in a time-scaled network diagram. (en)
dbo:wikiPageID
  • 29192306 (xsd:integer)
dbo:wikiPageLength
  • 6790 (xsd:nonNegativeInteger)
dbo:wikiPageRevisionID
  • 1052741795 (xsd:integer)
dbo:wikiPageWikiLink
dct:subject
rdf:type
rdfs:comment
  • The Graphical Path Method (GPM) is a mathematically based algorithm used in project management for planning, scheduling and resource control. GPM represents logical relationships of dated objects – such as activities, milestones, and benchmarks – in a time-scaled network diagram. (en)
rdfs:label
  • Graphical path method (en)
owl:sameAs
prov:wasDerivedFrom
foaf:isPrimaryTopicOf
is dbo:wikiPageDisambiguates of
is dbo:wikiPageWikiLink of
is foaf:primaryTopic of
Powered by OpenLink Virtuoso    This material is Open Knowledge     W3C Semantic Web Technology     This material is Open Knowledge    Valid XHTML + RDFa
This content was extracted from Wikipedia and is licensed under the Creative Commons Attribution-ShareAlike 3.0 Unported License