2024, Volume 16, Issue 1
- 63-80 Enhancing design–bid–build project delivery: A comprehensive review and framework for contractor selection and project optimisation in the construction industry
by Almuhannadi Mohammed Ali & Ghareeb Ahmed Salem - 81-92 ISM model for assessing critical productivity factors in the Jordanian construction industry post-COVID-19 pandemic
by Alshdiefat Ala’a Saleh - 93-108 An impact overview of COVID-19 on the construction industry in Pakistan
by Rashid Muhammad Usman & Usman Muhammad Farooq & Qasim Muhammad & Asad Muhammad - 109-122 Contract price change during the construction phase: unforeseen market conditions
by Suman Natasa & Tominc Stanko - 123-135 Analysis of the road safety in the EU countries and the impact of PBM on its improvement
by Tomašković Mladen & Završki Ivica - 136-149 Consolidating the roles of financial feasibility studies: Property developers vs quantity surveyors
by Terblanche Rolien & Root David Stanton - 150-169 Impact of quality change management on civil engineering projects in India
by Choudhary Dhruva & Singh Priyanka & Dixit Saurav - 170-185 Unsupervised machine learning for identifying key risk factors contributing to construction delays
by Al-Bataineh Fuad & Khatatbeh Ahmed Ali & Alzubi Yazan - 186-203 Investigating the relationship between knowledge management and organizational agility in an industrial company
by Aghileh Marzieh & Lima Rui - 204-223 Leadership practices and communication framework for project success – The construction sector
by Rehan Ashok & Thorpe David & Heravi Amirhossein - 224-236 Uncovering the hidden gem: The role of the undervalued quality in projects
by Erdei János & Sebestyén Zoltán & Alfreahat Dina - 251-274 Risk-based integrated performance assessment framework for public-private partnership infrastructure projects
by Fatima Anam & Mubin Sajjad & Masood Rehan - 275-288 Dynamics of organisational attractiveness and perceived attributes: Evidence from Turkish construction sector
by Pehlivanli Edib Ali
January 2024, Volume 16, Issue 1
- 1-12 Disruptive method for managing BIM design and construction using Kanban
by Gonzalez Carlos Francisco Lucena & Rodriguez Antonio Manuel Reyes & Manzanares Francisco Villena - 13-26 Life-cycle cost estimation of a building structure: An example of partition walls
by Biolek Vojtech & Hanak Tomaš - 27-37 The factors that affect constructability in Iraq
by Ahmed Ola Abdulhussein & Mahjoob Ahmed Mohammed Raoof - 38-51 Factors affecting the cooperative relationships in material supply chain of construction enterprises
by Hanh Nguyen Thi My & Toan Nguyen Quoc & Thanh Pham Quang - 52-62 Using building information modelling to optimise design quality of natural lighting in Iraqi school buildings
by Al-Rudainy Ahmed Saad Ali & Mahjoob Ahmed Mohammed Raoof
January 2023, Volume 15, Issue 1
- 1-22 Project success and critical success factors of construction projects: project practitioners’ perspectives
by Kumar Virender & Pandey Amrendra & Singh Rahul - 23-33 Exploring the social legitimacy of urban road PPPs in Nigeria
by Afieroho Ulohomuno Eze & Li Yongkui & Han Yilong & Radujkovic Mladen - 34-49 Enhancing building maintainability through early supplier involvement in the design process
by Othman Ayman Ahmed Ezzat & Kamal Ahmed - 50-62 Employee perspective on site accidents and corporate reputation in developing countries
by Adesi Michael & Owusu-Manu De-Graft & Boateng Frank & Ahiabu Moses - 63-78 Comparative assessment of deterministic methodologies for estimating excavation productivity
by Panas Antonios & Pantouvakis John-Paris & Kalogiannaki Maria - 79-89 A competency framework for strategic planning managers in multi-business holding organisations
by Ershadi Mahmoud & Moghaddam Mohammad Rahimi & Ezabadi Mohammad Ebrahim Raei - 90-106 Assessing the innovative skills and competencies required of construction management graduates
by Toyin James Olaonipekun & Mewomo Modupe Cecilia - 122-135 Green supply chain drivers and their implementation on LEED-certified projects in India
by Koul Pawan & Ghatak Ranjit Roy & Sinha Kunal - 136-156 Using the ordinal priority approach for selecting the contractor in construction projects
by Alkaabi Sajjad Ali Mahmood & Raoof Mahjoob Ahmed Mohammed - 157-168 Protecting the intellectual property of built environment designs using blockchain technology
by Darabseh Mohammad & Martins João Poças - 169-177 Theoretical approach to a lower limit of KPIs for controlling complex organisational systems
by Eber Wolfgang - 178-191 Assessment of interorganisational conflict in building refurbishment projects using EFA and PLS-SEM
by Noori Adel - 192-212 Estimation of ideal construction duration in tender preparation stage for housing projects
by Tirataci Hakan & Yaman Hakan - 213-220 Effective pre-qualification systems – Are they essential for minimising delays on road projects?
by Kapote Mangesh & Patil Pratik & Pimplikar Sunil - 221-232 Impact of project procurement systems on performance of Rwandan building construction projects
by Esperance Umuhoza & Sung-Hoon An - 233-242 Optimised technology for repair of vertical surface of concrete bridge elements
by Skazlić Marijan & Borovina Berislav & Gabrijel Ivan - 243-252 The role of competency-based certification in ensuring sustainable project delivery
by Rastovski Tomislav & Vlahov Golomejic Rebeka D. & Vukomanovic Mladen
January 2022, Volume 15, Issue 1
- 107-121 Determinants of collaborative hybrid organisations in the construction industry of the Republic of Croatia
by Moćan Dinko Stanković
January 2022, Volume 14, Issue 1
- 2539-2558 Linking life cycle BIM data to a facility management system using Revit Dynamo
by Thabet Walid & Lucas Jason & Srinivasan Sai - 2559-2570 Effects of lagging projectification in the public sector on realizing infrastructure projects
by Wagner Reinhard F. & Radujkovic Mladen - 2583-2600 Investigation of the poor-quality practices on building construction sites in Malaysia
by Olanrewaju Abdul Lateef & Lee Alice Hui Jing - 2601-2615 Knowledge management by construction management template for sustainable entrepreneurship
by Meneiluik Aleksandr & Nikiforov Aleksey - 2616-2630 A structured literature review on construction conflict prevention and resolution: A modified approach for engineering
by Sabri Omar & Lædre Ola & Bruland Amund - 2631-2639 Parsimonious process model of energy retrofit of buildings
by Turk Žiga & Ma Zhiliang & Klinc Robert - 2640-2655 Manageability of complex organisational systems – system-theoretical confines of control
by Eber Wolfgang - 2656-2665 Multi-criteria decision-making approach for selecting a structural system of an industrial facility
by Zumrut Irem Bayram & Baran Hamim Burak & Ozbalta Turkan Goksal - 2666-2674 A construction–specific extension to a standard project risk management process
by Alfreahat Dina & Sebestyén Zoltán - 2697-2709 Total quality management practices and its impact on Indian construction projects
by Vijayabanu C. & Karthikeyan S. & Vijay Surya P. - 2710-2730 Capability improvement measures of the public sector for implementation of building information modeling in construction projects
by Yusuf Anthony Olukayode & Opawole Akintayo & Musa Nofiu Abiodun & Kadiri Dele Samuel & Ebunoluwa Esther Ilori - 2731-2740 The reduction of vehicular traffic during the Zion Christian Church Easter weekend pilgrimage
by Mathebula Andrew Mabila & Smallwood John - 2741-2759 Real-estate price prediction with deep neural network and principal component analysis
by Mostofi Fatemeh & Toğan Vedat & Başağa Hasan Basri - 2760-2768 A DOSE to compare the level of performance between construction projects
by Alemu Teshale Teshome & Thakur Mohindra Singh
July 2021, Volume 13, Issue 2
- 2465-2471 Added value of sites suitable for sustainable office development
by Kupec Josef - 2472-2483 Construction health and safety: A topic landscape study
by Cao Xiaorui & Lu Ruodan & Guo Liang & Liu Jianya - 2484-2495 Understanding the effects of BIM implementation in corporation finance: An empirical study in China
by Wang Zhimin & Ma Jianjun - 2496-2504 Sleep duration and fatigue in construction workers: A preliminary study
by Ferrada Ximena & Barrios Silvia & Masalan Patricia & Campos-Romero Solange & Carrillo Juan & Molina Yerko - 2505-2520 A new framework for ranking Critical Success Factors for International Construction Projects
by Butković Lana Lovrenčić - 2521-2538 Determination of construction process duration based on labor productivity estimation: A case study
by Kubečková Darja & Smugala Stanislav
January 2021, Volume 13, Issue 2
- 2426-2437 Leadership skills, stakeholder management and execution of fibre-optic infrastructure: intervening influence of government policy
by Akhwaba James - 2438-2449 Providing a framework for optimizing a mixing design of reactive powder concrete (RPC)
by Moghaddam Farid Ghaffari & Akbarpour Abbas & Firouzi Afshin - 2450-2464 Network analysis of interconnections between theoretical concepts associated with principal–agent theory concerning construction projects
by Ceric Anita & Ivic Ivona
January 2021, Volume 13, Issue 1
- 2312-2326 Method for Base Estimation of Construction Time for Linear Projects in Front-end Project Phases
by Dunovic Ivana Burcar & Prebanic Kristijan Robert & Durrigl Pavao - 2327-2340 A study of project managers’ choice on key methods, tools and techniques in managing engineering projects
by Radujković Mladen & Klepo Mariela Sjekavica - 2341-2352 Estimation of the excavator actual productivity at the construction site using video analysis
by Šopić Martina & Vukomanović Mladen & Car-Pušić Diana & Završki Ivica - 2353-2366 On-site factories to support lean principles and industrialized construction
by Rosarius Anton & García de Soto Borja - 2367-2373 Assessing the role and significance of project selection by the contractors in the Saudi construction industry
by Bageis Abdulrahman & Alsulamy Saleh - 2374-2382 Drivers of cost and time overruns: A client and contractor perspective
by Dahlin Peter & Pesämaa Ossi - 2383-2390 Impact of management practices on construction productivity in Indian building construction projects: an empirical study
by Dixit Saurav - 2391-2415 A framework for achieving sustainability by overcoming the challenges of the construction supply chain during the design process
by Othman Ayman Ahmed Ezzat & AlNassar Nooran - 2416-2425 Analyzing and modeling thermal complaints in a commercial building in France
by Kocaman Ezgi & Kuru Merve & Çalış Gülben
January 2020, Volume 12, Issue 1
- 2044-2052 Motivation of civil engineers and architects in Turkey
by Damci Atilla & Arditi David & Polat Gul & Turkoglu Harun - 2044-2052 Motivation of civil engineers and architects in Turkey
by Damci Atilla & Arditi David & Polat Gul & Turkoglu Harun - 2053-2063 Potentials of artificial intelligence in construction management
by Eber Wolfgang - 2053-2063 Potentials of artificial intelligence in construction management
by Eber Wolfgang - 2064-2071 On-site inspections: the shift from forms to digital capture
by Rolfsen Christian Nordahl & Lassen Ann Karina - 2064-2071 On-site inspections: the shift from forms to digital capture
by Rolfsen Christian Nordahl & Lassen Ann Karina - 2072-2082 Detecting unbalanced bids via an improved grading-based model
by Polat Gul & Turkoglu Harun & Damci Atilla & Akin Firat Dogu - 2072-2082 Detecting unbalanced bids via an improved grading-based model
by Polat Gul & Turkoglu Harun & Damci Atilla & Akin Firat Dogu - 2083-2094 Qualitative analysis of Request For Information to identify design flaws in steel construction projects
by Fokwa Soh Mathieu & Barbeau Daniel & Doré Sylvie & Forgues Daniel - 2083-2094 Qualitative analysis of Request For Information to identify design flaws in steel construction projects
by Fokwa Soh Mathieu & Barbeau Daniel & Doré Sylvie & Forgues Daniel - 2095-2108 Demystifying progressive design build: implementation issues and lessons learned through case study analysis
by Shang Luming & Migliaccio Giovanni C. - 2095-2108 Demystifying progressive design build: implementation issues and lessons learned through case study analysis
by Shang Luming & Migliaccio Giovanni C. - 2109-2116 Industrialization of construction: Implications on standards, business models and project orientation
by Andersson Niclas & Lessing Jerker - 2109-2116 Industrialization of construction: Implications on standards, business models and project orientation
by Andersson Niclas & Lessing Jerker - 2117-2136 Four stages of making project management flexible: insight, importance, implementation and improvement
by Sohi Afshin Jalali & Bosch-Rekveldt Marian & Hertogh Marcel - 2137-2146 Application of time series models for heating degree day forecasting
by Kuru Merve & Calis Gulben - 2137-2146 Application of time series models for heating degree day forecasting
by Kuru Merve & Calis Gulben - 2147-2147 Erratum to: Review of previous applications of innovative information technologies in construction health and safety
by Mihić Matej & Vukomanović Mladen & Završki Ivica - 2147-2147 Erratum to: Review of previous applications of innovative information technologies in construction health and safety
by Mihić Matej & Vukomanović Mladen & Završki Ivica - 2148-2157 Model and data management issues in the integrated assessment of existing building stocks
by Honic Meliha & Kovacic Iva - 2158-2169 Organisational culture of construction companies in Lagos State, Nigeria
by Alao T.O. & Aina O.O. - 2158-2169 Organisational culture of construction companies in Lagos State, Nigeria
by Alao T.O. & Aina O.O. - 2170-2180 Symbiosis of life-cycle structural design and asset management based on Building Information Modeling: Application for industrial facility equipment
by Lenz Lisa & Weist Kai Christian & Hoepfner Marvin & Spyridis Panagiotis & Gralla Mike - 2193-2199 Unsuccessful bids: Coefficient of variation of bids as indicator of project risk
by Kim Young Joo & Skibniewski Miroslaw J. - 2193-2199 Unsuccessful bids: Coefficient of variation of bids as indicator of project risk
by Kim Young Joo & Skibniewski Miroslaw J. - 2218-2231 An automated nD model creation on BIM models
by Vycital Miroslav & Jarský Cenek - 2218-2231 An automated nD model creation on BIM models
by Vycital Miroslav & Jarský Cenek - 2232-2244 Construction labor and skill shortages in Croatia: causes and response strategies
by Ceric Anita & Ivic Ivona - 2232-2244 Construction labor and skill shortages in Croatia: causes and response strategies
by Ceric Anita & Ivic Ivona - 2245-2255 EPC 4.0: The quest for reducing CAPEX in EPC projects
by Wagner Reinhard F. - 2256-2274 Improving competences of engineers and workers in the AEC industry for delivering NZEBs
by Gumbarević Sanjin & Milovanović Bojan & Bagarić Marina & Gaši Mergim & Dunović Ivana Burcar - 2275-2282 Study of factors affecting the performance of construction projects in AEC industry
by Dixit Saurav
February 2019, Volume 11, Issue 1
- 1839-1852 A Review on Using Opportunities of Augmented Reality and Virtual Reality in Construction Project Management
by Ahmed Shakil - 1925-1932 Market value of the view restriction
by Hajnal István - 1968-1974 The Engineering Project Organization Society and megaprojects: literature analysis using keywords
by Ceric Anita & Sertic Josip
January 2019, Volume 11, Issue 1
- 1933-1951 Causes of Accident at Construction Sites in Bangladesh
by Ahmed Shakil - 1952-1967 Review of previous applications of innovative information technologies in construction health and safety
by Mihić Matej & Vukomanović Mladen & Završki Ivica - 1975-1983 Analysis of internationalization trends in the construction industry with an overview on Croatian construction companies
by Butković Lana Lovrenčić & Mihić Matej - 1984-1991 Measuring the performance of project risk management: a preliminary model
by Serpell Alfredo Federico & Ferrada Ximena & Rubio Larissa - 1992-2008 The Planning and Appraisal of Mega Transport Infrastructure Projects Delivered by Public–Private Partnerships: The Case for the Use of Policy-Led Multi-Criteria Analysis
by Ward John & Dimitriou Harry T & Field Brian G & Dean Marco - 2009-2021 The impact of changes in the geological conditions of road bedrock layers while the road was in use
by Smugala Stanislav & Kubečková Darja & Indra František - 2022-2033 An appraisal of building control and regulations practice in Nigeria: Project managers’ perspectives
by Osuizugbo Innocent Chigozie - 2034-2043 Supply chain management and lean concept in construction: a case of Ghanaian building construction industry
by Boateng Ali
March 2019, Volume 11, Issue 1
- 1853-1861 Overview of construction simulation approaches to model construction processes
by Bokor Orsolya & Florez Laura & Osborne Allan & Gledson Barry J. - 1892-1903 Identifying New Knowledge Areas to Strengthen the Project Management Institute (PMI) Framework
by Iyer K. Chandrashekhar & Banerjee Partha S. - 1904-1910 Evaluation of workplace safety performance in the Chinese petroleum industry
by Ma Mingxue & Tam Vivian WY & Huang Zhiyu & Sing Michael CP & Shen Liyin - 1911-1924 Enhancing the performance of architectural design firms through addressing the gap of workforce skills in developing countries: a good-to-great approach
by Othman Ayman Ahmed Ezzat & Sokkar Dana Ashraf
October 2018, Volume 10, Issue 1
- 1794-1802 An Analytical Study of Critical Factors Affecting Contractor Efficiency in Construction Projects in Indian Scenario
by Deep Shumank & Simon Laura & Asim Mohd & Rahimzadeh Ali & Al-Hamdani Sulala - 1803-1826 Optimization of Shoring/Reshoring Levels in High-Rise Building Construction
by Sohoni Prachi & Ghaffar Abdul & Matsagar Vasant A. & Jha K.N.
May 2018, Volume 10, Issue 1
- 1704-1718 Adaptive reuse: an innovative approach for generating sustainable values for historic buildings in developing countries
by Othman Ayman Ahmed Ezzat & Elsaay Heba - 1719-1726 Appraising the use of labour-only procurement system for building construction in Nigeria
by Akinkunmi Olutayo Gabriel & Aghimien Douglas Omoregie & Awodele Oluwaseyi Alabi
November 2018, Volume 10, Issue 1
- 1827-1838 Towards lean and green thinking in construction projects at Gaza Strip
by El-sawalhi Nabil I. & Jaber Bilal Majid & Shukri Abed Al
July 2018, Volume 10, Issue 1
- 1747-1760 Identification and evaluation of criteria for selecting contractors using a risk management approach
by Mousakhani Ehsan & Ranjbar Shirzad & Ashoori Taha - 1761-1769 The use of Bim in public construction supervision in Brazil
by Rocha de Matos Cleiton & Carlos de Oliveira Miranda Antonio
February 2018, Volume 10, Issue 1
- 1655-1664 Genetic algorithm optimization for dynamic construction site layout planning
by Farmakis Panagiotis M. & Chassiakos Athanasios P. - 1665-1673 Control panel and indicators for production control in building projects
by Orihuela Pablo & Pacheco Santiago & Orihuela Jorge - 1674-1683 Precedence permutation patterns creating criticality constellations: Exploring a conjecture on nonlinear activities with continuous links
by Lucko Gunnar & Su Yi - 1684-1695 Interaction researching mental spaces of movable context, stakeholders, and project manager
by Verenych Olena & Bushuyev Sergey - 1696-1703 Nigerian Professional Female Construction Workers in Vocational Occupations: Diversification or Deviation?
by Odubiyi Tawakalitu Bisola
August 2018, Volume 10, Issue 1
- 1778-1793 Analysis of Rework Risk Triggers in the Nigerian Construction Industry
by Eze Emmanuel Chidiebere & Idiake John Ebhohimen & Ganiyu Bashir Olanrewaju
June 2018, Volume 10, Issue 1
- 1727-1734 Power spectral and bispectral study of factors affecting employee turnover
by Tam Vivian W.Y. & Le Khoa N. - 1735-1746 Life cycle management in upgrade and renewal of civil infrastructures
by Hertogh Marcel J.C.M. & Bakker Jaap D. & Vlist Maarten J. van der & Barneveld Albert S.
June 2017, Volume 9, Issue 1
- 1528-1536 Construction mediation and its hybridization: the case of the Hong Kong construction industry
by Ng Pui-Lam & Banaitis Audrius - 1537-1546 Assessment of highway infrastructure projects in Latin America and Perú from the competences point of view
by Zevallos Germán Gallardo & Machicao Tatiana & Romero María Josée Martínez-Echevarría - 1547-1558 Achieving competitive advantage through the integration of disabled architects in architectural design firms in Egypt
by Othman Ayman Ahmed Ezzat & Sorial Marise Hossam Hosny
January 2017, Volume 9, Issue 1
- 1559-1564 Modeling of the Time Structure of Construction Processes Using Neural Networks
by Petlíková Kateřina & Jarský Čeněk - 1565-1573 Innovation of education for the development of key competencies of university graduates
by Bašková Renáta & Struková Zuzana - 1574-1583 Recognition of the role of nature in the formation of fractal architecture
by Mirmoradi Seyedeh Somayeh
December 2017, Volume 9, Issue 1
- 1584-1592 Assessing the influence of project management on quality during the early phases of construction projects
by Ljevo Žanesa & Vukomanović Mladen & Džebo Suada - 1593-1603 Cost and time performance of traditional-, direct labour- and management-procured public projects in Ondo State, Nigeria
by Aghimien Douglas Omoregie & Osanyinro Olufemi & Adegbembo Taiwo Fadeke - 1604-1614 Comparing three scheduling methods using BIM models in the Last Planner System
by Brioso Xavier & Murguia Danny & Urbina Alonso - 1615-1626 Evaluation of stigmatized properties
by Hajnal István - 1627-1637 An integration of spreadsheet and project management software for cost optimal time scheduling in construction
by Valenko Tadej & Klanšek Uroš - 1638-1654 A state-of-the-art review of built environment information modelling (BeIM)
by Tah J.H.M. & Oti A.H. & Abanda F.H.
December 2016, Volume 10, Issue 1
- 1770-1777 Exploring the consequences of human multitasking in industrial automation projects: a tool to mitigate impacts – Part II
by Petroutsatou Kleopatra & Sifiniadis Anestis
December 2016, Volume 8, Issue 1
- 1390-1396 Effect of bond administration on construction project delivery
by Oke Ayodeji Emmanuel - 1397-1404 Innovation enablers: A review of Turkish contractors’ collaborative activities and sources of information
by Ilter A. Tolga - 1405-1410 Preliminary estimate for reinforcement steel quantity in residential buildings
by Mahamid Ibrahim - 1411-1421 Sustainability in architectural heritage: review of policies and practices
by Sigmund Zvonko - 1422-1428 Strengths, weaknesses, opportunities and threats of virtual team in Nigerian construction industry
by Odubiyi Tawakalitu Bisola & Oke Ayodeji Emmanuel - 1429-1436 Women professionals’ participation in the nigerian construction industry: finding voice for the voiceless
by Jimoh Richard Ajayi & Oyewobi Luqman Oyekunle & Adamu Amina Nna & Bajere Paul Abayomi - 1437-1445 Supply chain collaboration within the Iranian construction industry
by Bidabadi Zahra Toroghi & Hosseinalipour Mujtaba & Hamidizadeh Mohammad Reza & Mohebifar Amirhossein - 1446-1455 The Road Pavement Condition Index (PCI) Evaluation and Maintenance: A Case Study of Yemen
by Karim Fareed M.A. & Rubasi Khaled Abdul Haleem & Saleh Ali Abdo - 1456-1463 Exploitation of cloud computing in management of construction projects in Slovakia
by Mandičák Tomáš & Mesároš Peter & Kozlovská Mária - 1464-1481 Project ambidexterity: case of recovering schedule delay in a brownfield airport project in India
by Iyer K. Chandrashekhar & Banerjee Partha S. - 1482-1498 Financial Planning and Management Practices of Electrical Contractors
by Lucko Gunnar - 1499-1510 Sixty years of project planning: history and future
by Hajdu M. & Isaac S. - 1511-1517 Incorporating Lean Construction agent into the Building Standards Act: the Spanish case study
by Brioso Xavier & Humero Antonio - 1518-1527 Arrangement of material depots for line segment–modeled structures using continuous conditions
by Pém Attila & Mályusz Levente