Hydropower
Plant | State | Scheme | Coordinates | MW | Owner/operator | Refs |
---|---|---|---|---|---|---|
Sultan Azlan Shah Bersia | Sungai Perak | 72 | ||||
Chenderoh Power Station | Sungai Perak | 40.5 | ||||
Sultan Azlan Shah Kenering Power Station | Sungai Perak | 120 | ||||
[Sungai Piah Upper Power Station]] | Sungai Perak | 14.6 | ||||
Sungai Piah Lower Power Station | Sungai Perak | 54 | ||||
Temenggor Power Station | Sungai Perak | 348 | ||||
Sultan Mahmud | Sungai Terengganu | 400 | [1] | |||
Sultan Ismail Petra Power Station Pergau Dam | Sungai Pergau | 600 | ||||
Sultan Yusof Jor Power Station | Cameron Highlands | 100 | ||||
Sultan Idris II | Cameron Highlands | 150 | [2] | |||
Odak Power Station | Cameron Highlands | 4.2 | ||||
Habu Power Station | Cameron Highlands | 5.5 | ||||
Kampong Raja Power Station | Cameron Highlands | 0.8 | ||||
Kampong Terla Power Station | Cameron Highlands | 0.5 | ||||
Robinson Falls Power Station | Cameron Highlands | 0.9 | ||||
Bakun Dam | 2400 | [3] | ||||
Batang Ai Dam at Lubok Antu, Sarawak | 100 | [3] [4] | ||||
Murum Dam in Sarawak (Under construction) | 944 | |||||
Tenom Pangi Dam at Tenom, Sabah | 66 |
Peninsular Malaysia
Tenaga Nasional Berhad operates three hydroelectric schemes in the peninsular with an installed generating capacity of 1,911 megawatts (MW). They are the Sungai Perak, Terengganu and Cameron Highlands hydroelectric schemes with 21 dams in operation.[5] A number of Independent Power Producers also own and operate several small hydro plants.
Independent hydroelectric schemes
- Sg Kenerong Small Hydro Power Station in Kelantan at Sungai Kenerong, 20 MW owned by Musteq Hydro Sdn Bhd, a subsidiary of Eden Inc Berhad
Sabah and Sarawak
Gas-fired
Plant | State | Coordinates | MW | Type | Owner/operator | Refs |
---|---|---|---|---|---|---|
Connaught Bridge Power Station | Selangor at Klang | 3°2′37″N 101°28′7″E / 3.04361°N 101.46861°E | 832 | Combined cycle (1 ST, 2 GT), open cycle (4 GT) | Tenaga Nasional Berhad | |
Genting Sanyen Kuala Langat Power Plant | Selangor at Kuala Langat | 720 | Combined cycle | Genting Sanyen Power Sdn Bhd | ||
Karambunai Power Station | Sabah at Karambunai | 120 | Open cycle (4 GT) | Ranhill Powertron Sdn Bhd, a subsidiary of Ranhill Berhad | ||
Lumut GB3 Power Station | Perak at Pantai Remis | 4°23′32″N 100°35′20″E / 4.39222°N 100.58889°E | 651 | Combined cycle (1 ST), open cycle (3 GT) | GB3 Sdn Bhd, a subsidiary of Malakoff | |
Lumut Power Station | Perak at Pantai Remis | 4°23′27″N 100°35′22″E / 4.39083°N 100.58944°E | 1,303 | Combined cycle (6 GT, 2 ST)[6] | Segari Energy Ventures Sdn Bhd, a subsidiary of Malakoff | [7] |
Nur Generation Plants | Kedah in Kulim High-Tech Industrial Park | 220 | Combined cycle (4 GT, 2 ST) | Nur Generation Sdn Bhd | ||
Paka power station | Terengganu at Paka | 4°36′4″N 103°26′57″E / 4.60111°N 103.44917°E | 808 | Combined cycle (4 GT, 2 ST) | YTL Power International Berhad | |
Pasir Gudang power station | Johor at Pasir Gudang | 1°27′2″N 103°52′48″E / 1.45056°N 103.88000°E | 404 | Combined cycle (2 GT, 1ST) | YTL Power International Berhad | |
Petronas Gas Centralized Utilities Facilities (CUF) | Pahang (Gebeng-Kerteh) | 3°59′23″N 103°22′16″E / 3.98972°N 103.37111°E | 324 | Cogen(9 GT) | Petronas Gas Berhad | |
Port Dickson Power Station | Negeri Sembilan in Port Dickson | 2°33′13″N 101°47′57″E / 2.55361°N 101.79917°E | 440 | Open cycle (4 GT) | Malakoff Berhad | |
Prai power station | Penang at Perai | 5°22′31″N 100°22′23″E / 5.37528°N 100.37306°E | 350 | Single shaft combine cycle (1 GT, 1 ST) | Prai Power Sdn Bhd, a subsidiary of Malakoff | [8] |
Putrajaya Power Station | Selangor at Serdang | 2°57′56″N 101°41′5″E / 2.96556°N 101.68472°E | 625 | Open cycle (5 GT) | Tenaga Nasional Berhad | |
Sarawak Power Generation Plant | Sarawak at Bintulu | 220 | Open cycle (2 GT) | Sarawak Power Generation Sdn Bhd, a subsidiary of Sarawak Energy Berhad | ||
Sepanggar Bay Power Plant | Sabah at Kota Kinabalu Industrial Park | 100 | Combined cycle | Sepangar Bay Power Corporation Sdn Bhd[9] | ||
Sultan Iskandar Power Station | Johor at Pasir Gudang | 1°26′58″N 103°52′51″E / 1.44944°N 103.88083°E | 729 | Thermal (2 ST), combined cycle (2 GT, 1 ST), open cycle (2 GT) | Tenaga Nasional Berhad | |
Sultan Ismail Power Station | Terengganu at Paka | 4°35′50″N 103°27′3″E / 4.59722°N 103.45083°E | 1,136 | Combined cycle (8 GT, 4 ST) | Tenaga Nasional Berhad | |
Tanjung Kling Power Station | Malacca at Tanjung Kling | 2°13′24″N 102°9′7″E / 2.22333°N 102.15194°E | 330 | Combined cycle (2 GT, 1 ST)[10] | Pahlawan Power, a subsidiary of Powertek | [8] |
Telok Gong Power Station 1 | Malacca at Telok Gong | 2°20′51″N 102°3′6″E / 2.34750°N 102.05167°E | 440 | Open cycle (4 GT) | Powertek | [8] |
Telok Gong Power Station 2 | Malacca at Telok Gong | 2°20′51″N 102°3′6″E / 2.34750°N 102.05167°E | 720 | Combined cycle (2 GT, 1ST) | Panglima Power, a subsidiary of Powertek | |
Teknologi Tenaga Perlis Consortium | Perlis at Kuala Sungai Baru | 650 | Combined cycle | Teknologi Tenaga Perlis Consortium Sdn Bhd / Global E-Technic Sdn Bhd | ||
Tuanku Jaafar Power Station | Negeri Sembilan at Port Dickson | 2°31′59″N 101°47′29″E / 2.53306°N 101.79139°E | 1,500 | Combined cycle (4 GT, 2 ST) | Tenaga Nasional Berhad | [8] [11] |
Note: GT - Gas Turbine unit(s); ST - Steam Turbine unit(s).
Coal-fired (or combined gas/coal)
Plant | State | Coordinates | MW | Type | Owner/operator | Refs |
---|---|---|---|---|---|---|
Jimah Power Station | Negri Sembilan at Lukut | 2°35′11″N 101°43′21″E / 2.58639°N 101.72250°E | 1,400 | Thermal (2 ST) | Jimah Energy Ventures Sdn Bhd | [12] |
Manjung Power Station | Perak at Manjung | 4°9′44″N 100°38′48″E / 4.16222°N 100.64667°E | 2,295 | Thermal (3 ST) | TNB Janamanjung Sdn Bhd | [12] |
Mukah Power Station | Sarawak | 2°55′56″N 112°11′32″E / 2.93222°N 112.19222°E | 270 | Thermal (2 ST) | [12] [13] | |
PPLS Power Generation Plant | Sarawak in Kuching | 110 | Thermal (2 units) | PPLS Power Generation, a subsidiary of Sarawak Energy Berhad | ||
Sejingkat Power Corporation Plant | Sarawak at Kuching | 100 | Thermal | Sejingkat Power Corporation Sdn Bhd, a subsidiary of Sarawak Energy Berhad | [12] | |
Sultan Salahuddin Abdul Aziz Shah Power Station | Selangor at Kapar | 3°7′1″N 101°19′1″E / 3.11694°N 101.31694°E | 2,420 | Thermal (6 ST), open cycle (2 GT), natural gas and coal with oil backup | Kapar Energy Ventures Sdn Bhd | |
Tanjung Bin Power Station | Johor at Pontian | 1°20′3″N 103°32′55″E / 1.33417°N 103.54861°E | 2,100 | Thermal (3 ST) | Tanjong Bin Power Sdn Bhd, a subsidiary of Malakoff | [12] |
Note: ST - Steam Turbine unit(s).
Oil-fired
Plant | State | Coord. | MW | Type | Owner/operator |
---|---|---|---|---|---|
Gelugor Power Station | Penang at Teluk Ewa | 5°22′49″N 100°18′53″E / 5.38028°N 100.31472°E | 398 | Combined cycle | Tenaga Nasional Berhad |
Melawa Power Station | Sabah in Melawa | 50 | 4 diesel engines | ARL Tenaga Sdn Bhd | |
Sandakan Power Corporation Plant | Sabah at Sandakan | 34 | 4 diesel engines | Sandakan Power Corporation Sdn Bhd | |
Stratavest Power Station | Sabah at Sandakan | 60 | 4 diesel engines | Stratavest Sdn Bhd | |
Tawau Power Plant | Sabah at Tawau | 36 | 3 diesel engines | Serudong Power Sdn Bhd |
Biomass
Plant/owner/operator | State | Coord. | MW | Type | Fuel |
---|---|---|---|---|---|
Bumibiopower Sdn Bhd (planning approved 2001) | Perak at Pantai Remis | 6 | Steam turbines | Empty fruit bunch | |
Jana Landfill Sdn Bhd | Selangor at Seri Kembangan | 2 | Gas turbines | Biogas | |
TSH Bio Energy Sdn Bhd | Sabah at Tawau | 14 | Steam turbines | Empty fruit bunch | |
Potensi Gaya Sdn Bhd (planning approved 2003) | Sabah at Tawau | 7 | Steam turbines | Empty fruit bunch | |
Alaff Ekspresi Sdn Bhd (planning approved 2003) | Sabah at Tawau | 8 | Steam turbines | Empty fruit bunch | |
Naluri Ventures Sdn Bhd (planning approved 2005) | Johor at Pasir Gudang | 12 | Steam turbines | Empty fruit bunch | |
Seguntor Bioenergy Sdn Bhd (planning approved 2007) | Sabah at Sandakan | 11.5 | Steam turbines | Empty fruit bunch | |
Kina Biopower Sdn Bhd (planning approved 2007) | Sabah at Sandakan | 11.5 | Steam turbines | Empty fruit bunch | |
Recycle Energy Sdn Bhd (commercial operation 2009) | Selangor at Semenyih | 8.9 | Steam turbine | Refuse-derived fuel |
Hybrid power stations
Pulau Perhentian Kecil, Terengganu with a combined capacity of 650[14] kilowatts
- Two 100 kW wind turbines
- One 100 kW solar panels
- Two diesel generators capable of 200 and 150 kW respectively
Proposed
See also
References
- ^ "Kenyir (Sultan Mahmud) Hydroelectric Power Project". Global Energy Observatory. Retrieved 18 June 2014.
- ^ "Woh (Sultan Idris II) Hydroelectric Power Plant". Global Energy Observatory. Retrieved 18 June 2014.
- ^ a b "Hydroelectric Power Plants in Asia-Pacific - other". Gallery. Power Plants Around The World. 11 June 2014. Retrieved 18 June 2014.
- ^ "Batang Ai Dam Hydroelectric Power Plant". Global Energy Observatory. Retrieved 18 June 2014.
- ^ "TNB Hydro Power Schemes" (PDF). Tenaga Nasional Berhad.
- ^ K. Rolf, et al.: Combined-cycle gas & steam turbine power plants, Chapter 11. PennWell Books, 1999.
- ^ "CCGT Plants in Malaysia". Gallery. Power Plants Around The World. 29 August 2010. Retrieved 15 June 2014.
- ^ a b c d Cite error: The named reference
IndustCardsCC
was invoked but never defined (see the help page). - ^ "GE Energy signs equipment, service contracts for new Power Plant in Malaysia". Electric Energy Publications. November 15, 2005. Retrieved 2009-05-27.
- ^ "Powertek Berhad:Our Plants". Retrieved 2009-05-22.
- ^ "Tuanku Jaafar (TJGS) CCGT Power Plant". Global Energy Observatory. Retrieved 15 June 2014.
- ^ a b c d e "Coal-Fired Power Plants in Malaysia". Gallery. Power Plants Around The World. 29 August 2010. Retrieved 15 June 2014.
- ^ "Mukah Coal Power Plant". Global Energy Observatory. Retrieved 15 June 2014.
- ^ Michael Cheang (2007-09-25). "Wind, Sun and Diesel". The Star (Malaysia). Retrieved 2009-05-21.
- ^ "Ulu Jelai Hydroelectric Project". SMEC Holdings. Retrieved 2012-09-20.