[go: up one dir, main page]

Jump to content

Renfe Class 102

From Wikipedia, the free encyclopedia
(Redirected from Renfe Class 112)

Renfe Class 102
AVE Class 102
In service2005 - present
ManufacturerTalgo, Bombardier
Formation2 driving cars and 12 passenger cars per train set
Capacity
OperatorsRenfe
Lines served
  • S-102
    Madrid - Málaga
    Seville - Valencia
    Madrid - Huesca
  • S-112
    Málaga - Barcelona
    Seville - Barcelona
    Madrid - Valencia
    Madrid- León
    Madrid - Albacete[citation needed]
Specifications
Train length200 m (656 ft 2 in)
Width2.94 m (9 ft 7+34 in)
Height3.36 m (11 ft 14 in)
Maximum speed350 km/h (220 mph)
Weight322 t (317 long tons; 355 short tons)
Power output8,000 kW (11,000 hp)
Electric system(s)Overhead, 25 kV 50 Hz AC
Current collector(s)Pantograph
Safety system(s)LZB, ASFA 200, ERTMS
Track gauge1,435 mm (4 ft 8+12 in) standard gauge

The Renfe Class 102 or S-102[note 1] (nicknamed "Pato" in Spanish, because of its nose that looks like the beak of a duck) is a high-speed train used for the AVE service and operated in Spain by the state-run railway company Renfe, and based on Bombardier Transportation's power car technology. Outside AVE service, Talgo markets this train as the Talgo 350.[1]

Further production of closely related trains, differing in seating arrangement, resulted in the S-112.

Background, design and orders

[edit]

The AVE Class 102 was constructed by Talgo with Adtranz (later Bombardier Transportation) providing the power car technology. It was primarily designed for the Madrid-Barcelona line.

The trainsets consist of Talgo passenger cars modified in order to allow speeds of up to 350 km/h (220 mph) with power cars at each end. However, its certified maximum operating speed is 330 km/h (210 mph) due to the limits of its eight 1,000 kW (1,300 hp) motors. The trainsets can consist of up to 12 Talgo series VII coaches.

Power unit with a 'beak'

The train is nicknamed Pato, Spanish for duck, due to the aerodynamic design of the power cars resembling a beak. The beak design reduces noise created by air resistance at top speeds.

The series trains were intended for a top speed of 330 km/h (210 mph).[2] This top speed was supposed to be enough to fulfill the tender condition of a two-and-a-half-hour travel time between Madrid and Barcelona. Experts ascribe this reduction compared to original plans to budgetary reasons, which derive from the strongly increased power requirements at even higher speeds.[3]

Renfe Class 112

[edit]

Renfe's original order in 2004 was for 16 series units, delivery of which began in 2004. A follow-up order for 30 similar trains to be delivered in 2008-2010 and designated as class 112 (S-112). The first production unit was unveiled in June 2010.[4]

Introduction, testing and operations

[edit]

In trials with the prototype unit (later used by track authority ADIF as test train Class 330), on 11 October 2002, 362 km/h (225 mph) was achieved.[5]

Type approval tests began in 2004. Type approval requires test runs at speeds 10% above the desired permitted top speed. During the approval tests, a new record of 365 km/h (227 mph) was achieved in the early hours of 26 June 2004.[6]

After the successful completion of the tests, the first eight series units commenced operation on the Madrid-Zaragoza-Lleida line on 26 February 2005.[7] Initially, maximum service speed was restricted to 200 km/h (120 mph), due to problems with the train control and signalling system on the line.

After the commissioning of the train control system ETCS L1, the top speed was increased in steps.[8] Since 7 May 2007,[9] the trains travel with the top speed targeted for the time being[7] 300 km/h (190 mph).

After the stabilisation of the train control system ETCS L2, the trains may cover the distance of 621 km between Madrid and Barcelona in about 2 hours 30 minutes, with a top speed of 330 km/h (210 mph).[10] However, presently, non-stop runs are carried by the Class 103 trains, while the S-102 are deployed for runs with intermediate stops, with travel times between 2 hours 57 minutes and 3 hours 23 minutes.[8]

Export

[edit]
Talgo 350 for Haramain HSR

Talgo 350 trains based on the Class 102 design are being used on the Haramain high-speed railway line in Saudi Arabia under a contract announced in October 2011. The service became operational in September 2018.[11]

See also

[edit]

Notes

[edit]
  1. ^ S-102 denotes 'Serie 102 de Renfe', the 1xx series is used for fixed passenger high speed electric trains

References

[edit]
  1. ^ "Very High Speed – Talgo 350 Trainset with Series VII cars". Talgo America. Archived from the original on 26 December 2010.
  2. ^ "El tren AVE S-102 comienza a prestar servicio comercial en la línea Madrid-Zaragoza-Lleida" (in Spanish). Renfe. 26 February 2005. Retrieved 11 January 2009.[permanent dead link]
  3. ^ "El AVE de Siemens correrá más rápido que el de Talgo". CincoDías (in Spanish). 4 August 2003. Retrieved 11 January 2009.
  4. ^ "Renfe unveils Class 112 high speed train". Railway Gazette International. 30 June 2010.
  5. ^ "Las pruebas del Talgo 350 en la línea de alta velocidad". Líneas de Tren (in Spanish). Archived from the original on 29 August 2008. Retrieved 30 December 2008.
  6. ^ "Un AVE con vagones fabricados en Valladolid bate el récord de velocidad en España, 404 km/h". El Norte Castilla (in Spanish). 6 October 2006. Archived from the original on 11 November 2009.
  7. ^ a b "Magdalena Álvarez presenta los nuevos trenes AVE S-102]" (PDF). Spanish Transport Ministry. 23 February 2005.
  8. ^ a b "Barcelona, nuevo destino AVE" (PDF). Revista del Ministerio de Fomento. Nº 571. March 2008. Retrieved 16 January 2009.[dead link]
  9. ^ Spanish Transport Ministry (21 April 2008). "15 años de Ave: de ilusión por el progreso a símbolo del desarrollo presente y futuro de España" (PDF) (Press release) (in Spanish).[dead link]
  10. ^ "Civils and signals block speed-up on world's fastest line". Railway Gazette International. 161 (4): 179. 1 April 2005. ISSN 0373-5346.
  11. ^ "Spanish consortium wins Haramain High Speed Rail contract". Railway Gazette International. 26 October 2011.
[edit]