[go: up one dir, main page]

Jump to content

List of railway stations in Dover

From Wikipedia, the free encyclopedia

Railways in Dover
Charlton Tunnel
Dover Priory
Dover Harbour Tunnel
Dover Harbour
1861–1927
Mileage Change
↑ 77 mi 76 ch (Victoria)
↓ 76 mi 50 ch (Charing Cross)
Hawkesbury Street Junction
connection to train ferry
Pier Junction
Admiralty Pier
1860–1909
Dover Marine/Western Docks
1909–1994
Dover Town
1844–1914
Archcliffe Junction

Dover, Kent has had numerous railway stations due to the legacy of competition between the South Eastern Railway (SER) and London, Chatham and Dover Railway (LCDR) and the subsequent rationalisation attempts by their successors: the South Eastern and Chatham Railway (SECR), Southern Railway and British Rail Southern Region.

A 1945 Ordnance Survey map of Dover showing the location of Dover Priory and Dover Marine
A 1908 Railway Clearing House map of lines around Dover (right pane)

Current station

[edit]
Dover Priory in 2007

Opened on 22 July 1861 as Dover Town (Priory) by the LCDR,[1] Dover Priory railway station became a through station on 1 November the same year, upon completion of a tunnel through the Western Heights connecting it to LCDR's new Dover Harbour Station in the Western Docks area. The renaming in July 1863 as Dover Priory[1] led rival SER to adopt the name "Dover Town" for one of its Dover stations.[2] Dover Priory is the only station still open in Dover.

Former stations

[edit]

Besides Dover Priory, there have been five other stations in Dover, all of which are now closed.

Dover Harbour

[edit]
Goods train from Eastern Docks running along Marine Parade in 1956

The name Dover Harbour has been used for two separate stations. The first was opened by the LCDR on 1 November 1861; this was closed in June 1863 when it was replaced by a new station named Dover Town and Harbour. This was renamed Dover Harbour on 1 July 1899 and closed on 10 July 1927.[1] The LCDR constructed a tunnel through the Western Heights to allow continental traffic to access the Western Docks in 1861, and just south of the tunnel, on the current track to Folkestone, a station was built. Later an extension was also built onto Admiralty Pier. It was closed in 1927 by Southern as part of their rationalisation and modernisation of the Dover area.[3] Although the platforms have been demolished as in March 2017 the station buildings still survive as offices.

Dover Town

[edit]

The SER's original station opened on 7 February 1844 as Dover,[1] and was situated on Shakespeare Beach just east of where the current line from Folkestone turns north towards Dover Priory. This was originally a terminus, but later the line continued onto Admiralty Pier. It was renamed Dover Town in December 1861, and was closed on 14 October 1914[1] as part of rationalisation and modernisation of the Dover area by SECR.[4] After closure for passengers the track/platforms were in use for freight/engineers use until the 1990s. After the track was removed the area was used for car parking and as of March 2017 some sections of platforms still survive.

Admiralty Pier

[edit]

In 1860 SER started running trains on to the pier, the LCDR following in 1864. This exposed halt was extended and replaced by Dover Marine in 1909.[5] The SER station at Dover Admiralty Pier opened on 30 August 1864 and closed in August 1914.[1]

Dover Prince of Wales Pier

[edit]

This station was opened in 1902 and closed in 1909.[1]

Dover Marine/Dover Western Docks

[edit]
Dover Western Docks station in 1990
The former Dover Western Docks station in 2007

Situated on Admiralty Pier for connection to ships, this was constructed on an expanded pier by SECR, finished in 1914, began to be used on 2 February 1915 but was not available for public use until 18 January 1919; in the meantime it had been renamed Dover Marine on 5 December 1918. It was a large terminus with four platforms covered by a full roof. Platforms were extended to take 12-car trains in February 1959.[6] It was renamed again to Dover Western Docks on 14 May 1979, and was closed by British Rail on 26 September 1994[1] with the demise of boat trains and the opening of the Channel Tunnel. It is now a cruise liner terminal.[7]

Work on the new train ferry pier at the station suffered damage worth £300,000 during the Great storm of 1987.[8]

Regie voor Maritiem Transport used to run ferries until 1994 from here to Oostende railway station which connected into Belgian railway line 50A run by NMBS. There was a fast ferry service using the Jetfoil as well as conventional ferries.

The Southern Railway opened a large locomotive depot at the site in 1928. This was closed in 1961 and demolished.[9]

Dover Locomotive Depot 22 April 1951.

See also

[edit]

References

[edit]
  1. ^ a b c d e f g h Butt, R.V.J. (1995). The Directory of Railway Stations. Yeovil: Patrick Stephens Ltd. pp. 81–82. ISBN 1-85260-508-1. R508.
  2. ^ "Dover Priory Station". Dover - Lock and Key of the Kingdom. 2007. Archived from the original on 7 February 2007. Retrieved 10 February 2007.
  3. ^ "Dover Harbour Station". Dover - Lock and Key of the Kingdom. 2007. Archived from the original on 7 February 2007. Retrieved 10 February 2007.
  4. ^ "Dover Town Station". Dover - Lock and Key of the Kingdom. 2007. Archived from the original on 7 February 2007. Retrieved 10 February 2007.
  5. ^ "Admiralty Pier". Dover - Lock and Key of the Kingdom. 2007. Archived from the original on 7 February 2007. Retrieved 10 February 2007.
  6. ^ Railway Magazine March 1959 p. 211
  7. ^ "The Marine Station". Dover - Lock and Key of the Kingdom. 2007. Archived from the original on 7 February 2007. Retrieved 10 February 2007.
  8. ^ "The big storm". Rail. No. 76. January 1988. p. 14.
  9. ^ Griffiths, Roger; Smith, Paul (1999). The directory of British engine sheds: 1. Oxford: OPC., p.61.
[edit]