Adaptation to an uncertain climate change: cost benefit analysis and robust decision making for dam dimensioning
Hypatia Nassopoulos,
Patrice Dumas () and
Stephane Hallegatte
Additional contact information
Hypatia Nassopoulos: CIRED - centre international de recherche sur l'environnement et le développement - Cirad - Centre de Coopération Internationale en Recherche Agronomique pour le Développement - EHESS - École des hautes études en sciences sociales - AgroParisTech - ENPC - École des Ponts ParisTech - CNRS - Centre National de la Recherche Scientifique
Patrice Dumas: CIRED - centre international de recherche sur l'environnement et le développement - Cirad - Centre de Coopération Internationale en Recherche Agronomique pour le Développement - EHESS - École des hautes études en sciences sociales - AgroParisTech - ENPC - École des Ponts ParisTech - CNRS - Centre National de la Recherche Scientifique
Post-Print from HAL
Abstract:
Climate models project large changes in rainfall, but disagree on their magnitude and sign. The consequences of this uncertainty on optimal dam dimensioning is assessed for a small mountainous catchment in Greece. Optimal dam design is estimated using a Cost-Benefit Analysis (CBA) based on trends in seasonal temperature and precipitations from 19 IPCC-AR4 climate models driven by the the SRES A2 emission scenario. Optimal reservoir volumes are modified by climate change, leading to up to 34% differences between optimal volumes. Contrary to widely-used target-based approaches, the CBA suggests that reduced rainfall should lead to smaller water reservoirs. The resulting change in the Net Present Value (NPV) of water supply is also substantial, ranging from no change to a large 25% loss, depending on the climate model, even assuming optimal adaptation and perfect foresight. In addition, climate change uncertainty can lead to design errors, with a cost ranging from 0.3 to 2.8% of the NPV, depending on site characteristics. This paper proposes to complement the CBA with a robust decision-making approach that focuses on reducing design-error costs. It also suggests that climate change impacts in the water sector may reveal large, that water reservoirs do not always provide a cost-efficient adaptation strategy, and that alternative adaptation strategies based on water conservation and non-conventional water production need to be considered. 2012 Springer Science+Business Media B.V.
Keywords: climate; change (search for similar items in EconPapers)
Date: 2012-10
Note: View the original document on HAL open archive server: https://enpc.hal.science/hal-00719113
References: View references in EconPapers View complete reference list from CitEc
Citations: View citations in EconPapers (8)
Published in Climatic Change, 2012, 114 (3-4), pp.497-508. ⟨10.1007/s10584-012-0423-7⟩
Downloads: (external link)
https://enpc.hal.science/hal-00719113/document (application/pdf)
Related works:
Journal Article: Adaptation to an uncertain climate change: cost benefit analysis and robust decision making for dam dimensioning (2012)
This item may be available elsewhere in EconPapers: Search for items with the same title.
Export reference: BibTeX
RIS (EndNote, ProCite, RefMan)
HTML/Text
Persistent link: https://EconPapers.repec.org/RePEc:hal:journl:hal-00719113
DOI: 10.1007/s10584-012-0423-7
Access Statistics for this paper
More papers in Post-Print from HAL
Bibliographic data for series maintained by CCSD ().